Kontron ThinkIO-P Quick Start Manual
Kontron ThinkIO-P Quick Start Manual

Kontron ThinkIO-P Quick Start Manual

Premium din rail pc for fieldbus and io systems
Hide thumbs Also See for ThinkIO-P:

Advertisement

ThinkIO™ - P
Premium DIN Rail PC
for Fieldbus and IO Systems
Manual ID: 29867.01, Rev. Index 01
17 October, 2005
QUICK START GUIDE
The product described in this manual is
in compliance with all applied CE stan-
dards.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ThinkIO-P and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Kontron ThinkIO-P

  • Page 1 ThinkIO™ - P Premium DIN Rail PC for Fieldbus and IO Systems Manual ID: 29867.01, Rev. Index 01 17 October, 2005 QUICK START GUIDE ™ The product described in this manual is in compliance with all applied CE stan- dards.
  • Page 2: Imprint

    Copyright © 2005 Kontron Modular Computers GmbH. All rights reserved. This manual may not be copied, photocopied, reproduced, translated or converted to any electronic or machine- readable form in whole or in part without prior written approval of Kontron Modular Computers. GmbH.
  • Page 3: Table Of Contents

    1.7 Software and Documentation ............... 2 Pre-Operation ....................3 2.1 System Configuration ................... 3 2.2 Power Requirements ..................4 2.3 Installation of the ThinkIO-P ................. 4 Initial Operation ....................5 3.1 Power On ..................... 5 3.2 System Operation Verification ..............5 ID 29867.01, Rev.
  • Page 4: Proprietary Note

    This document contains information proprietary to Kontron Modular Computers GmbH. It may not be copied or transmitted by any means, disclosed to others, or stored in any retrieval sys- tem or media without the prior written consent of Kontron Modular Computers GmbH or one of its authorized agents.
  • Page 5: Explanation Of Symbols

    CE Conformity This symbol indicates that the product described in this manual is in compliance with all applied CE standards. Please refer also to the section “Applied Standards” in the ThinkIO-P Hardware Reference Guide. Caution, Electric Shock! This symbol and title warn of hazards due to electrical shocks (> 60V) when touching products or parts of them.
  • Page 6: For Your Safety

    1 to 2 seconds. Exercise care when handling a ThinkIO-P that has just been operated. If necessary, cool down the ThinkIO-P before handling it.
  • Page 7: General

    The ThinkIO-P The ThinkIO-P is an industrial PC packaged in an assembly, 224 x 70 x 100 mm, for mounting on a DIN rail. It can be complemented with WAGO-I/O-SYSTEM-750/753 input and output modules using the optional WAGO interface module (K-Bus) for controlling of the I/O modules.
  • Page 8: The Wago Interface And I/O Modules

    The ThinkIO-P is designed to be mounted on a securely fixed, grounded, top-hat DIN rail for operation. If for any reason that this is not possible, it must be ensured that the ThinkIO-P is placed on a secure, flat, level surface with ESD protection before being operated.
  • Page 9: Pre-Operation

    QUICK START GUIDE Pre-Operation System Configuration Basically, a ThinkIO-P application is comprised of the ThinkIO-P hardware, the ThinkIO-P soft- ware, interfacing cabling, and, as an option, a WAGO interface module (K-Bus) and, as re- quired, optional WAGO-I/O-SYSTEM 750/753 modules. Figure 2-1: ThinkIO-P and K-Bus Cabling Diagram...
  • Page 10: Power Requirements

    Flash card, and will result in improper operation of the system. Power Requirements The ThinkIO-P itself requires 24 V DC for operation. This is supplied via the X4 connector. The optional WAGO-I/O-SYSTEM 750/753 modules have their own power input connections.
  • Page 11: Initial Operation

    Assistance Guides. System Operation Verification When power is applied to the ThinkIO-P the system initializes itself and then boots the operat- ing system. At completion of the boot process, control of the system is available to an operator. To proceed, perform the following: 1.
  • Page 12 For example, during bootup the status LEDs are operated in accordance with pre-programmed functionality. This information is contained in the Hardware Reference Guide for the ThinkIO-P. If access is available to the operating system, various configuration informa- tion is available via OS functions. Refer to the appropriate Programming As- sistance Guide for more information.

Table of Contents