Test Setup and Results
4.4
Load Regulation
The load regulation for the TPS561201EVM-896 is shown in
4.5
Line Regulation
The line regulation for the TPS561201EVM-896 is shown in
6
TPS561201EVM-896 1-A, SWIFT™ Regulator Evaluation Module
3.00%
2.00%
1.00%
0.00
-1.00%
-2.00%
-3.00%
0
0.1
0.2
0.3
0.4
Output Current (A)
Figure 3. Load Regulation
1.06
1.055
1.05
1.045
1.04
4
6
8
10
Input Voltage (V)
TPS561201: I
Figure 4. Line Regulation
Copyright © 2017, Texas Instruments Incorporated
Figure
3.
V
= 5 V
IN
V
= 12 V
IN
0.5
0.6
0.7
0.8
0.9
1
D003
Figure
4.
12
14
16
18
D004
= 0.5 A
OUT
www.ti.com
SLVUB34 – April 2017
Submit Documentation Feedback
Need help?
Do you have a question about the SWIFT TPS561201EVM-896 1-A and is the answer not in the manual?