www.ti.com
4.10 Shut-Down
The TPS561201EVM-896 shut-down waveform relative to V
resistive.
The TPS561201EVM-896 shut-down waveform relative to EN is shown in
resistive.
Figure 12. Shut-Down Relative to Input Voltage
SLVUB34 – April 2017
Submit Documentation Feedback
TPS561201EVM-896 1-A, SWIFT™ Regulator Evaluation Module
Copyright © 2017, Texas Instruments Incorporated
is shown in
Figure
12. Load = 1.05 Ω
IN
Figure
13. Load = 1.05 Ω
Figure 13. Shut-Down Relative to EN
Test Setup and Results
9