Texas Instruments TPS563300EVM-226 User Manual

Texas Instruments TPS563300EVM-226 User Manual

3-a regulator evaluation module

Advertisement

Quick Links

www.ti.com
User's Guide
TPS563300EVM-226 3-A Regulator Evaluation Module
This user's guide contains information for the TPS563300 as well as support documentation for the TPS563300
evaluation module. Included are the performance specifications, board layout, schematic, and the list of
materials of the TPS563300EVM.
1
Introduction.............................................................................................................................................................................2
2 Performance Specification Summary...................................................................................................................................
3
Modifications...........................................................................................................................................................................2
3.1 Output Voltage Setpoint.....................................................................................................................................................
4 Test Setup and Results..........................................................................................................................................................
4.1 Input and Output Connections...........................................................................................................................................
4.2 Start-Up Procedure............................................................................................................................................................
4.3 Load Transient Response..................................................................................................................................................
4.4 Output Voltage Ripple........................................................................................................................................................
4.5
Start-Up..............................................................................................................................................................................9
4.6 Shutdown...........................................................................................................................................................................
Layout.........................................................................................................................................................................10
5.1 Layout..............................................................................................................................................................................
6 Schematic and List of Materials..........................................................................................................................................
6.1 Schematic........................................................................................................................................................................
6.2 List of Materials................................................................................................................................................................
Figure 4-1. TPS563300EVM Connectors and Jumpers Placement............................................................................................
Figure 5-1. TPS563300EVM Top Assembly..............................................................................................................................
Figure 5-2. TPS563300EVM Top Layer.....................................................................................................................................
Figure 5-5. TPS563300EVM Board Bottom View......................................................................................................................
Figure 6-1. TPS563300EVM Schematic Diagram.....................................................................................................................
Table 4-1. Connection and Test Points........................................................................................................................................
Materials.........................................................................................................................................................14
SLUUCM7 - OCTOBER 2022
Submit Document Feedback
ABSTRACT

Table of Contents

List of Figures
= 3 A.................................................................................................
OUT
= 2 A.................................................................................................
OUT
= 1 A.................................................................................................
OUT
= 500 mA..........................................................................................
= 100 mA..........................................................................................
= 0 A.................................................................................................
OUT
..............................................................................................................
............................................................................................................9
Layer................................................................................................................................11
View............................................................................................................................12
List of Tables
Summary...............................................................................................................2
Summary........................................................................................................................2
Copyright © 2022 Texas Instruments Incorporated
A/µs............................................................4
A/µs......................................................5
TPS563300EVM-226 3-A Regulator Evaluation Module
Table of Contents
2
3
3
3
4
4
6
9
10
13
13
14
3
6
6
7
7
8
8
9
10
11
12
13
4
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS563300EVM-226 and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments TPS563300EVM-226

  • Page 1: Table Of Contents

    Table of Contents User’s Guide TPS563300EVM-226 3-A Regulator Evaluation Module ABSTRACT This user's guide contains information for the TPS563300 as well as support documentation for the TPS563300 evaluation module. Included are the performance specifications, board layout, schematic, and the list of materials of the TPS563300EVM.
  • Page 2: Introduction

    3 Modifications These evaluation modules are designed to provide access to the features of the TPS563300. Some modifications can be made to this module. TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 3: Output Voltage Setpoint

    TP7 providing a convenient ground reference. TP1 is used to monitor the output voltage with TP9 as the ground reference. Vout Figure 4-1. TPS563300EVM Connectors and Jumpers Placement SLUUCM7 – OCTOBER 2022 TPS563300EVM-226 3-A Regulator Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 4: Start-Up Procedure

    VOUT = 200mV/div (AC coupled) IOUT = 2A/div 100uS/div Figure 4-2. TPS563300EVM Load Transient Response, 1-A – 3-A Load Step, 0.8 A/µs TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 5: Figure 4-3. Tps563300Evm Load Transient Response, 0.5-A - 2.5-A Load Step

    VOUT = 200mV/div (AC coupled) IOUT = 2A/div 100uS/div Figure 4-3. TPS563300EVM Load Transient Response, 0.5-A – 2.5-A Load Step, 0.8 A/µs SLUUCM7 – OCTOBER 2022 TPS563300EVM-226 3-A Regulator Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 6: Output Voltage Ripple

    = 3 A VOUT = 20mV/div (AC coupled) IL = 1A/div 2uS/div Figure 4-5. TPS563300EVM Output Voltage Ripple, I = 2 A TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 7: Figure 4-6. Tps563300Evm Output Voltage Ripple, I

    = 1 A VOUT = 20mV/div (AC coupled) IL = 500mA/div 2uS/div Figure 4-7. TPS563300EVM Output Voltage Ripple, I = 500 mA SLUUCM7 – OCTOBER 2022 TPS563300EVM-226 3-A Regulator Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 8: Out Out

    = 100 mA VOUT = 20mV/div (AC coupled) IL = 500mA/div 4mS/div Figure 4-9. TPS563300EVM Output Voltage Ripple, I = 0 A TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 9: Start-Up

    The TPS563300EVM shutdown waveform with 20-MHz scope bandwidth relative to V is shown in Figure 4-11. Load = 3 A. Figure 4-11. TPS563300EVM Shutdown Relative to V SLUUCM7 – OCTOBER 2022 TPS563300EVM-226 3-A Regulator Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 10: Board Layout

    Both the top layer and bottom layer use 2 oz copper thickness. Figure 5-4 Figure 5-5 are the TPS563300EVM board top view and bottom view, respectively. Figure 5-1. TPS563300EVM Top Assembly TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 11: Figure 5-2. Tps563300Evm Top Layer

    Board Layout Figure 5-2. TPS563300EVM Top Layer Figure 5-3. TPS563300EVM Bottom Layer SLUUCM7 – OCTOBER 2022 TPS563300EVM-226 3-A Regulator Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 12: Figure 5-4. Tps563300Evm Board Top View

    Board Layout www.ti.com Figure 5-4. TPS563300EVM Board Top View Figure 5-5. TPS563300EVM Board Bottom View TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 13: Schematic And List Of Materials

    TPS563300PDRLR TP10 53.6k Bode 10.2k TP11 10pF 49.9k 5.1V 49.9k 10nF Zener TP12 TP13 TP14 TP15 TP16 Figure 6-1. TPS563300EVM Schematic Diagram SLUUCM7 – OCTOBER 2022 TPS563300EVM-226 3-A Regulator Evaluation Module Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 14: List Of Materials

    CAP, CERM, 10 µF, 50 V,+/- 10%, X7R, AEC-Q200 CGA5L1X7R1H106K160AC Grade 1, 1206 CAP, CERM, 10 pF, 50 V, +/- 5%, C0G/NP0, 0603 C0603C100J5GACTU Kemet TPS563300EVM-226 3-A Regulator Evaluation Module SLUUCM7 – OCTOBER 2022 Submit Document Feedback Copyright © 2022 Texas Instruments Incorporated...
  • Page 15 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 16 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 17 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 18 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 19 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2019, Texas Instruments Incorporated...
  • Page 20 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2022, Texas Instruments Incorporated...

Table of Contents