Setting Reactive Power Regulation; Setting Active Power Response; Do Function Setting - Sungrow SH3K6-30 User Manual

Grid-connected hybrid inverter
Hide thumbs Also See for SH3K6-30:
Table of Contents

Advertisement

User Manual
(3) The 10-minute over-voltage protection is not applicable to country
Netherlands (NL). The default value of 10-minute over-voltage is 248.0 V
for New Zealand ("NZ").

10.4.9 Setting Reactive Power Regulation

For details, see "11 Appendix II: Reactive Power Regulation".

10.4.10 Setting Active Power Response

For details, see "12 Appendix III: Active Power Response".

10.4.11 DO Function Setting

Setting Load Control
After connecting the load to the DO terminals, a relay control signal will be
transmitted. Users can flexibly set the control mode via the LCD menu.
Press
/
to choose the control
mode. Press
ENT
Timer Control
In this mode, set the Start time and
End time, the system will control the
load operation during the interval.
Take 09:00 am
example.
Inverter
DO relay
ON/OFF Control
to confirm.
09:30 am as an
DO port
ON1
COM1
Fig. 10-2 DO Operation in Timer Control
DO Function
OFF
Load Control
Earth Fault
Load Control
Timer
ON/OFF
Optimized
Grid
Contactor
10 Appendix I: LCD Operation
Load Control
Timer
ON/OFF
Optimized
Start Time1
00:00
End Time1
00:00
Start Time2
00:00
End Time2
00:00
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sh4k6-30Sh5k-30

Table of Contents