The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76
168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a
statement or advice on any of the Electrical or Solar Industry standards or guidelines. Please
observe all OH&S regulations when working on Sungrow equipment.
The commissioning phase of the SH5K-30 inverter is straight forward and simple. All
settings are done from the front panel, and there is no longer any need to manually
enter the battery details – the system will automatically detect a powered-up battery.
On first initialisation, the flowing will appear on the LCD screen.
Enter to set/check the country code
Enter "AU" for AS/NZS 4777 as default
Select appropriate DNSP, or manually enter
grid protection parameters (Default DNSP power factor settings will be loaded)
GD_202005_SH5K-30_Quick Commissioning Guide_V1.0
Page 1 of 5
© Sungrow Australia Group Pty. Ltd. All rights reserved.
The information in this document is subject to change without notice.

Advertisement

loading

Summary of Contents for Sungrow SH5K-30

  • Page 1 SH5K-30 Quick Commissioning Guide Disclaimer The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement or advice on any of the Electrical or Solar Industry standards or guidelines.
  • Page 2 Must be enabled if there is another inverter Enter inverter AC power. Export can also be set GD_202005_SH5K-30_Quick Commissioning Guide_V1.0 Page 2 of 5 © Sungrow Australia Group Pty. Ltd. All rights reserved. The information in this document is subject to change without notice.
  • Page 3 Check / set time and date as required Incorrect time setting will affect monitoring Save GD_202005_SH5K-30_Quick Commissioning Guide_V1.0 Page 3 of 5 © Sungrow Australia Group Pty. Ltd. All rights reserved. The information in this document is subject to change without notice.
  • Page 4 Enter the amount of capacity to be reserved for blackout Save Select Exit GD_202005_SH5K-30_Quick Commissioning Guide_V1.0 Page 4 of 5 © Sungrow Australia Group Pty. Ltd. All rights reserved. The information in this document is subject to change without notice.
  • Page 5 Inverter will go into ‘Standby’ momentarily. Confirmation that Energy Meter and Battery are connected If the issue persists after following above procedures, please take photos testing on site and contact Sungrow Service Department on 1800 786 476 or email to service@sungrowpower.com.au. GD_202005_SH5K-30_Quick Commissioning Guide_V1.0 Page 5 of 5 ©...