Commissioning of SH5K-20 Hybrid Inverters
Disclaimer
The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76
168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a
statement or advice on any of the Electrical or Solar Industry standards or guidelines. Please
observe all OH&S regulations when working on Sungrow equipment.
The commissioning phase of the SH5K-20 inverter is straight forward and simple. All
settings are done from the front panel, and there is no longer any need to manually
enter the battery details – the system will automatically detect a powered-up battery.
On first initialisation, the flowing will appear on the LCD screen.
grid protection parameters (Default DNSP power factor settings will be loaded)
GD_201904_SH5K-20_Quick Commissioning Guide_V1.0
© Sungrow Australia Group Pty. Ltd. All rights reserved.
As we continuously improving our products, changes to this document may occur without notice.
Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476)
service@sungrowpower.com.au
Enter to set/check the country code
Enter "AU" for AS/NZS 4777 as default
Select appropriate DNSP, or manually enter
|
www.sungrowpower.com.au
Page 1 of 10

Advertisement

loading

Summary of Contents for Sungrow SH5K-20

  • Page 1 Commissioning of SH5K-20 Hybrid Inverters Disclaimer The material in this document has been prepared by Sungrow Australia Group Pty. Ltd. ABN 76 168 258 679 and is intended as a guideline to assist solar installers for troubleshooting. It is not a statement or advice on any of the Electrical or Solar Industry standards or guidelines.
  • Page 2 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au Enter to save Check / set time and date as required Incorrect time setting will affect monitoring Setting the Zero Export GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 2 of 10 ©...
  • Page 3 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au ‘ON’ = No power exported. “OFF” = All power exported. “PARTIAL” = set by watts Default = Partial 5000 watts Set Reactive power if required. Note: Grid settings already have State requirements loaded when DNSP selected.
  • Page 4 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au Weekday and weekend time zones available Generally, only set if customer is on TOU metering. Otherwise leave as default. EPS (Off-Grid) setting only if EPS box connected and maximum 3 kW output under EPS mode.
  • Page 5 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au Enter to save Enter to test Earth Fault alarm Enter to save and exit GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 5 of 10 © Sungrow Australia Group Pty. Ltd. All rights reserved.
  • Page 6 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au There are a couple of subsequent settings that may be required depending on the configuration. If there is an existing PV system on the same phase, it must be enabled in the settings otherwise some errors (error 084) may occur.
  • Page 7 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au Enter ‘Existing System’ Enable and enter Enter the AC power of the total inverters on the same phase only (you can also change the export limit here) Enter to save GD_201904_SH5K-20_Quick Commissioning Guide_V1.0...
  • Page 8 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au There may also be a requirement from the customer to reserve a set amount of battery capacity to be available in the event of a blackout. This will quarantine a pre-set amount and will take that amount out of the daily cycle capacity.
  • Page 9 Sungrow Australia Group Pty. Ltd. | 1800 SUNGROW (786 476) service@sungrowpower.com.au www.sungrowpower.com.au EPS setting Enable Enter to confirm Enter desired value, based on a calculation of total capacity, load, and how long backup is required for. Enter to save and finish.
  • Page 10 Off-grid function; if the function is OK and then turn the grid supply main to ON. 4. After completing these testing, the system should run OK. For any assistance, please contact Sungrow Service Department on 1800 786 476. GD_201904_SH5K-20_Quick Commissioning Guide_V1.0 Page 10 of 10 ©...