Advertisement

Further

Installation Instructions

UAPE-L
Index
Hub Feet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Beam Supports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Beam Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
In-Feed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Hub Electrical . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Power Pole . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Beam Trim . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20
Electrical Port Cover . . . . . . . . . . . . . . . . . . . . . . . . 20
Beam Mounted Screens & Modesties . . . . . . . . . . . 21
Data Entry . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Wire Managers . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Wire Chain . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Hinged Trough . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Worksurface Bracket . . . . . . . . . . . . . . . . . . . . . . . . 27
Worksurface Support legs . . . . . . . . . . . . . . . . . . . . 27
Stiffeners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Run Off Surfaces . . . . . . . . . . . . . . . . . . . . . . . . . . . 28
Support Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
H-Leg . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Storage Basics . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
. . . . . . . . . . . . . . . . . . . . . . . . . . 34
Up Mounted Storage . . . . . . . . . . . . . . . . . . . . . . . . 35
Table Mounted Screens . . . . . . . . . . . . . . . . . . . . . . 37
Laptop Drawer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Rail & Accessories . . . . . . . . . . . . . . . . . . . . . . . . . . 41
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Adaptive Beam Supports . . . . . . . . . . . . . . . . . . . . . 44
Worksurface Supports . . . . . . . . . . . . . . . . . . . . . . . 47
Worksurface Positioning . . . . . . . . . . . . . . . . . . . . . 50
10/2019
. . . . . . . . . 2
. . . . . . . . . . . . . . . . 3
. . . . . . . . . . . . . . . 19
. . . . . . . . . . . . . . . . . . . 22
. . . . . . . . . . 26

Tools Needed

6" Bit Extender
1/8" Drill Bit
1/4" Hex Drive Bit
#2 Phillips Bit
#3 Phillips Bit
M4 Hex Allen Wrench
3/32" Hex Allen Wrench
7/16" Box End Wrench
Flat Head Screwdriver
Short Phillips Screwdriver
Rubber Mallet
Allsteel
Allsteel Inc.
Muscatine, Iowa 52761-0071
www.allsteeloffice.com
3430358000
Drill

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Further and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Allsteel Further

  • Page 1: Table Of Contents

    Further Installation Instructions UAPE-L Index System Installation Outline . . . . . . . . . 2 Beams and Supports . . . . . . . . . . . . . . . . 3 Hub Feet .
  • Page 2: System Installation Outline

    Further Installation Packet W A R N I N G Failure to install product as instructed, use of hardware other than that which is provided, or failure to comply with instructions can result in product failure, personal injury, or property damage.
  • Page 3: Beams And Supports

    Further Installation Packet Create Beams & Supports 3430358000 Page 3 of 54...
  • Page 4: Hub Feet

    Further Installation Packet Hub Feet - Leveling Note - The Further system features 4 versions of hub feet; all install in a similar fashion . Flexible Hub Flexible Hub Fixed Hub Fixed Hub 2-Feet 3-Feet End of Run In-Line 1 - Fasten two machine screws to foot using locknuts .
  • Page 5 Further Installation Packet Create Hub Feet - Nonleveling Note - Nonleveling feet are for use with Collaborative Hubs only . All hubs supporting beams require leveling . 1 - Remove standard hub base . 2 - Attach hub foot to bottom of hub assembly .
  • Page 6: Beam Supports

    Further Installation Packet Beam Connectors Note - Various supports may be used on either side of a beam . Beam connectors should be attached to both ends before installation to vertical supports . In-Line Hub End Leg In-Line Leg H-Leg...
  • Page 7 Further Installation Packet Create Flexible Hub Note - One to four beams can be connected to the hub using the Hub-to-Beam Bracket at any 30° increment . 1 - Attach hub-to-beam bracket to end of beam . 2 - Attach bracket and beam to top casting of hub .
  • Page 8 Further Installation Packet Standard Bench End 1 - Assemble end support . Refer to individual models for installation . 2 - Measure and mark a vertical line in the direct center of the beam . Flat Beam Trim Nonported Beam...
  • Page 9 Further Installation Packet Create Square In-Line Hub/H-Leg/In-Line Leg 1 - Attach mounting bracket to beam . 2 - Attach bracket and beam to support . 3 - Install Electrical (11) . 4 - Secure beam trim to mounting brackets .
  • Page 10 Further Installation Packet Square Bench End 1 - Attach mounting bracket to beam . 2 - Attach bracket and beam to bench end support . 3 - Install Electrical (Page 11) . D x1 D x4 G x2 4 - Secure beam trim to mounting bracket .
  • Page 11: Electrical

    Further Installation Packet Create Electrical 3430358000 Page 11 of 54...
  • Page 12 ELL and Extended Straight Connectors. (3-Hot/3-Neutral/2-Ground) of Power In-feeds needed. • The Eight-circuit system (back-to-back four-circuit systems) Further Installation Packet Flexconnect™ Electrical System Options You can also choose a three-circuit, eight-wire system that has a dedicated neutral for every hot circuit. The three-circuit components The four-circuit, eight-wire electrical system is widely specified and have model numbers with an “A” suffix.
  • Page 13: Beam Electrical

    Further Installation Packet Create Beam Power Kits 1 - Insert duplexes into power blocks . NOTE: Single Blocks are not symmetric! 2 - Connect power blocks to jumper . Beam Beam Center 3 - Connect beam to beam jumpers between kits as needed .
  • Page 14: In-Feed

    Further Installation Packet In-feeds & Hub to Beam Power Kits Note: In-feeds DO NOT connect directly to Beam Power Kits . Hub to Beam Kits include a Jumper and H-connector to connect In-feed to system within a Support or Power Pole .
  • Page 15: Hub Electrical

    Further Installation Packet Create Ported Flexible Hub 1 - Install duplexes into power block . (one half only) 2 - Unsnap hub side cover . 3 - Connect power block to jumper or in-feed . 4 - Place spacer plate over duplexes; insert power block into hub ports .
  • Page 16: Power Pole

    Further Installation Packet Power Pole - Flexible Hub Note - Hub and beam structure must be completely assembled prior to power pole installation . 1 - Attach mounting bracket to hub using preinstalled hub screws . 2 - Secure trim plates to top and bottom of power pole .
  • Page 17 Further Installation Packet Create Power Pole Connector - End of Run Hub Note - Hub to Beam Power Kit must be installed before Power Pole and Ceiling In-feed . 1 - Detach Beam Connector Bracket from Hub support . 2 - Insert In-feed through hole of Ported Hub Cover & attach to H-connector .
  • Page 18 Further Installation Packet Power Pole - Fixed Hubs/H-Leg Note - Power Pole installation shown on End of Run Hub . Similar steps used for other applicable supports . 1 - Remove cover from Power Pole; position around ceiling in-feed .
  • Page 19: Beam Trim & Screens

    Further Installation Packet Create Beam Trim & Screens 3430358000 Page 19 of 54...
  • Page 20: Beam Trim

    Further Installation Packet Beam Trim Note - Electrical must be installed prior to Trim . 1 - Attach “L” bracket to beam trim (flat or mounting rail version). 2 - Press trim over beam until it snaps into place; may require rubber mallet .
  • Page 21: Beam Mounted Screens & Modesties

    Further Installation Packet Create Beam Mounted Screens Notes - Beam Trim for Mounting required to attach screens to top of beam . 1 - Mount screen retainer into beam trim channel . 2 - Tighten retainer to beam trim using cinch tabs .
  • Page 22: Wire Management

    Further Installation Packet Create Wire Management 3430358000 Page 22 of 54...
  • Page 23: Data Entry

    Further Installation Packet Create Data Entry Note - Data does not route into beam . Cables rest in wire managers below beams . Data faceplates mount into wire manager knock-out ports . Flexible Hub Fixed Hub High Capacity Hub features data ports on each face.
  • Page 24: Wire Managers

    Further Installation Packet Dual Sided Wire Manager 1 - Attach Wire Manager to bottom of beam . 2 - Route data cables into wire manager . Bend tabs up for proper Note - cables may enter throuh end of tray, or knock-out ports.
  • Page 25: Wire Chain

    Further Installation Packet Create Wire Chain 1 - Attach wire chain mounting bracket to tray of single-sided wire manager . 2 - Mount second mounting bracket to underside of surface . Alternate Mounting Method for Note - Surface bracket must be mounted directly above tray for proper alignment.
  • Page 26: Worksurfaces & Supports

    Further Installation Packet Create Worksurfaces & Supports 3430358000 Page 26 of 54...
  • Page 27: Worksurface Bracket

    Further Installation Packet Create Worksurface Bracket 1 - Hook bracket into beam side rail; rotate downward until fully seated . 2 - Align bracket with pilot holes and secure worksurface . Note - Pilot holes are not present for corner cove or perpendicular worksurfaces.
  • Page 28: Stiffeners

    Further Installation Packet External Worksurface Stiffeners 1 - Attach stiffener to bottom of worksurface. Outer screws align with pilot holes. Note - Corner Cove Stiffener attaches diagonally to the worksurface. O x10 qty varies ~6 .25” Pilot Holes Run Off Surfaces Note - Runoff worksurfaces require the use of a Flat Bracket.
  • Page 29: Support Storage

    Further Installation Packet Create Support Pedestal 1 - Level storage unit near intended location . 2 - Secure front of worksurface making sure all edges are flush. 3 - Secure back of worksurface . Note - 21”D pedestal back panel must be removed; held in place by Keku clips.
  • Page 30: H-Leg

    Further Installation Packet Support Tower 1 - Level storage unit near intended location; remove drawer . 2 - Pilot holes for L-bracket are located on inside of tower . Drill holes through outer walls with 1/8” drill bit . Note - Only drill out pilot holes on sides which support a worksurface. Holes may also be used to gang two adjacent towers together.
  • Page 31: Storage Basics

    Further Installation Packet Create Storage Basics - Drawer Removal and Installation Removal: 1 - Fully extend drawer and locate black plastic retaining tabs centered along length of each drawer slide . 2 - Press firmly on retaining tabs and pull drawer forward.
  • Page 32 Further Installation Packet Storage Basics - Sliding Door Installation and Removal 1 - Use a flat blade screwdriver to turn adjustment screw to raise or lower door . The adjustment screw has five preset positions of adjustment for both raising and lowering the door .
  • Page 33 Further Installation Packet Create Storage Basics - Hinged Door Adjustment Side-To-Side Adjustment: 1 - Fully close cabinet doors . 2 - Locate door alignment screw on door hinge assembly . 3 - Use Phillips screwdriver to adjust door alignment screw .
  • Page 34: Accessories

    Further Installation Packet Create Accessories 3430358000 Page 34 of 54...
  • Page 35: Up Mounted Storage

    Further Installation Packet Create Beam Mounted Storage - Stanchion Kit Note - Mounting Beam Trim required to attach storage to top of beam . 1 - Mount stanchions to bottom surface of storage unit . Note - Pilot hole availability varies; see diagram below for specific applications.
  • Page 36 Further Installation Packet Worksurface Mounted Storage - Stanchion Kit 1 - Mount stanchions to bottom of storage unit . Align center hole of rear stanchion with pilot hole for proper alignment . 2 - Attach secondary stanchion to rear support as shown .
  • Page 37: Table Mounted Screens

    Further Installation Packet Create Table Mounted Screen Note - Worksurfaces do not have pilot holes for the Table Mounted Screen . 1 - Center screen retainer between support legs, flush with back edge of worksurface; mount to bottom of surface .
  • Page 38 Further Installation Packet Table Mounted Privacy Panel Note - Worksurfaces do not have pilot holes for Privacy Panel . 1 (Glass Only) - Attach supplied bracket onto each end of the glass panel . 2 - Center screen between worksurface supports; attach to bottom of surface .
  • Page 39 Further Installation Packet Create Lateral Screen 1 - Position lateral screen around back of worksurface until flange of the screen is flush with the edge of the worksurface. 2 - Fasten screen into bottom of worksurface until screws are fully seated .
  • Page 40: Laptop Drawer

    Further Installation Packet Laptop Drawer Note - Table legs must be installed to worksurface prior to installation of laptop drawer 1 - Place drawer on bottom of worksurface; drawer front sits flush with front 3430358000_ILL_18a edge, flanges sit 4.5” from side edge.
  • Page 41: Rail & Accessories

    Further Installation Packet Create Accessory Rail Note - Install rail prior to beam attachment and wire management 1 - Center accessory rail between worksurface surpports, flush with back 3430358000_ILL_19b edge of worksurface as shown; attach to surface . 3430358000_ILL_19a O x3...
  • Page 42 Further Installation Packet Cord Organizer 1 - Align Cord Organizer flush against back edge of worksurface. 2 - Attach to bottom of worksurface . 343038000_ILL_19c_B Note - Organizer may be attached to accessory rail with self-drilling screws. 343038000_ILL_19c_A O x2...
  • Page 43: Adaptive

    Further Installation Packet Create Adaptive 3430358000 Page 43 of 54...
  • Page 44 Further Installation Packet Adaptive End Support - Dual Sided 1 - Hook beam connector into the side channel . 2 - Attach Support Legs D x2 over beam connector . 3 - Attach outer cross member to support leg assemblies . Install center...
  • Page 45 Further Installation Packet Create Adaptive Mid Support - All Variations 1 - Place Mid Support in desired location . Electrical and data routes through side access panel when applicable . Knockouts in access panels for routing data cables. To open Access Panel: press up, pull bottom out, press back down.
  • Page 46 Further Installation Packet Beam End Cap 1 - Attach end cap bracket to beam and top cap . 2 - Press fit end cap into bracket. Rubber mallet may be required to fully seat cap. G x4 Adaptive Beam-to-Beam Connector 1 - Attach in-line bracket to in-line beam section .
  • Page 47 Support Columns - Retainer Clip Further Installation Packet Create Adaptive Support Columns - Height Adjustable Gusset Note - There are left and right hand gussets . Each surface requires one of each . Left Right Side Port 1 - Place Support Column into gusset with controls facing the side port .
  • Page 48 Further Installation Packet Adaptive Support Columns - Retainer Clip 1 - Attach Retainer Clip to bottom of each support column . Fixed Height Height-Adjustable G x4 R x4 Adaptive Support Columns - Connecting to Structure 1 - Slide support columns down into their respective locations until retainer clips snap into position .
  • Page 49 Further Installation Packet Create Adaptive Perpendicular Outer Support 1 - Align outer sleeve with corner pilot holes as shown; attach to surface . 2 - Position support column so gusset sits flush against outer sleeve cutout with arms facing the user ege; attach gusset to surface .
  • Page 50: Worksurface Positioning

    Further Installation Packet Adaptive Worksurfaces - Positioning Note - Worksurfaces must have a 1” gap between edges to minimize pinch points . Standard pilot holes align with a slot in support gussets which allows surfaces to be centered or shifted in either direction to create this gap .
  • Page 51 Further Installation Packet Create Adaptive Worksurfaces - Positioning Continued Perpendicular Beam ~6.5” Centerline Outer support position is 3.0” determined by support shroud. See next page. 120° Station For best alignment, secure center support before outer supports. Pilot holes for center support align with centermost bracket holes.
  • Page 52 Further Installation Packet Adaptive Worksurfaces - Control Box Kit 1 - Attach control box on bottom of worksurface about 2 .5” from back edge . Note - Install box to the left or right of center for monitor arm clearance, if specified.
  • Page 53 Further Installation Packet Create Adaptive Floor Anchor Brackets - Single Sided Condition End Support 1 - Level and position system in desired final position. 2 - Place anchor bracket over rear leveling glide of end support . 3 - Attach anchor bracket to floor with appropriate hardware per floor type.
  • Page 54 Further Installation Packet Fastener Chart 1/4 - 20 x 1 .25” #10 x 1” Silver Undercut Flat Head Black Flat Head 350-1295 350-0050 1/4 - 20 x 1 .25” #10 x 1” Silver Flat Head Silver Flat Head 350-1025 350-0580 #8 x 1”...

Table of Contents

Save PDF