Opening The Casing Of Activation Switch, Replacing The Batteries - Conrad Electronic FAZ 3000-SE-2 Operating Instructions Manual

Radio controlled activation switch
Table of Contents

Advertisement

11. Opening the casing of activation switch,
replacing the batteries
Before opening the activation switch's casing, the activation
switch must be set to maintenance mode. Otherwise the alarm
base station immediately sets off the sabotage alarm when the
casing is opened.
Proceed as follows:
• The alarm base station must be in the top level.
The LCD should appear as on the right, for
example, with the time and the date.
• Briefly press the 'Menü a/A' button on the control
unit of the 'FAZ-Z' alarm base station.
• Use the ' ' and ' ' buttons to select the
'service
service' menu. See the figure on the right.
service
service
service
• Confirm your selection by briefly pressing the
'OK' button.
The first sensor that was registered with the alarm
base station is displayed.
• Press the ' ' button repeatedly, until the list of
activation switches is displayed, see figure right.
If more than one activation switch is linked to the
alarm base station, you can scroll through these
with the ' ' and ' ' buttons.
• Confirm your selection by briefly pressing the
'OK' button.
You can now open the casing of the selected
sensor without setting off a sabotage alarm, in
order to replace the batteries, for example. No
data is lost and the sensor or the device does not
need to be registered again afterwards.
30
disarm
17:25 20.03
troubles
service
contact
livingr
W1
rem. sw.
front
door
rem. sw.
- service -
1
1
1

Advertisement

Table of Contents
loading

Table of Contents