Technical data
1)
2.5
If the steam bath control device is installed in the technical room
The control device can be installed directly on the outer side of the cabin or at another
If the steam
location, however not within the cabin. If the installation is not done directly on the outer
bath control
wall of the cabin then the following points should be noted:
device is not
mounted
directly on the
outer wall of the
cabin
Figure. 1: Cabling while installing the steam bath control device not directly on the outer wall of the cabin
12 Installation instructions Steam bath control Series FCU2000/FCU3000/FCU4000/FCU5000 M_FCUxxxx-Steam_EN / Version V2.04
Lay the signal cables separately from the power line.
Do not lay the signal cables parallel to the power line.
Install a distribution box for the signal lines and another one for the power lines as
per figure Figure. 1.