Installation; Indoor And Outdoor Unit Shipping Split; (All Sizes) - Carrier AERO 39MN Installation, Start-Up And Service Instructions Manual

Indoor and weathertight outdoor air handlers
Table of Contents

Advertisement

*Minimum number of piers shown for pier-mounted unit. See
table on right for number of equally spaced piers required.
For each additional 8 ft of unit length, add 2 piers.

INSTALLATION

This section describes how to install 39M units, components,
and component parts. Units specified on a single order are
shipped with most components assembled in the specified airflow
direction. When an upper component exceeds the 108-in. maxi-
mum height limit, it is shipped out of its operating position. Some
component parts also require assembly or adjustment; see the sec-
tion on each component type for specific instructions.
CAUTION
Failure to assemble the units according to the procedures
set forth below is considered improper installation and
abuse and may not only negatively impact the weathertight
performance of the unit, but may also negatively affect the
Carrier warranty.
Indoor and Outdoor Unit Shipping Split (All
Sizes)
NOTE: The following hardware is included with the unit:
2 per split —
/
in.-16 nut
3
8
2 per split —
3
/
in.-16 x 8 in. screw
8
2 per split —
/
in. washer
3
8
2 per split —
1
/
in.-13 nut
2
2 per split —
/
in.-13 x 8 in. screw
1
2
2 per split —
1
/
in. washer
2
1 per Intelliclamp* connector —
1 per Intelliclamp connector —
Stacked units also include size AB
varies with unit size) and gasket required for field installation.
*Registered trademark of Industrilis.
W
Fig. 13 — Pier or Beam Mounting
/
in.-18 nut
5
16
5
/
in.-18 x 2
1
/
screw
16
2
/
/
screws (quantity
1
3
4
4
BEAM MOUNT
PIER MOUNT*
L
QUANTITY OF PIERS REQUIRED
0-8
4
NON-STACKED UNITS
1. The 39M split units will arrive at the jobsite in separate
pieces with section to section gasket installed. If the gasket
is damaged, obtain the required length of 0.25 in. x 1.50 in.
closed cell gasketing locally (i.e. McMaster 8694K94 or
Grainger 6YLW0).
2. Set upstream section on roof curb first for outdoor units or
on the pad for indoor units.
3. Remove shipping cover.
4. Set downstream section on roof curb or pad. Refer to unit
nameplate (Fig. 1A) for sequence of section order. Down-
stream section must be set within
section for proper installation.
5. Pull baserails to contact bottom lifting lug connection. Do
not fully tighten. See Fig. 14, Detail C.
6. Align top brackets. Start the screw, but do not fully tighten.
See Fig. 14, Detail A. For outdoor units, removal of the
roof at the split is necessary to access the top brackets.
7. On side of unit, when Intelliclamp connectors are present
(sizes 36 and larger only), align Intelliclamp connector,
start the screw, but do not fully tighten. See Fig. 14, Detail
B.
8. (SIZES 17 AND LARGER ONLY) Remove the roof at the
split to access the top Intelliclamp connector(s), align the
Intelliclamp connector(s) and start the screw but do not ful-
ly tighten.
9. Fully tighten all bolts starting from the base rails and mov-
ing to the top. For outdoor units, reinstall all roof sections.
Section to section gasket should be compressed to a thick-
ness no larger than
ping split joints from top of inside roof overhang to roof
curb.
48
UNIT LENGTH "L", FT
9-16
17-24
6
8
1
/
in. of the upstream
2
1
/
inch. Apply a bead of caulk at ship-