Once Start-up is complete, send a completed copy of this checklist to the applicable
Sales Engineer and Post Sale Product Marketing at 39MW@carrier.utc.com
I. PRELIMINARY INFORMATION
MODEL NO. _________________________________ JOB NAME _____________________________________________
SERIAL NO. _________________________________ ADDRESS _____________________________________________
START-UP DATE ______________________________
TECHNICIAN NAME ___________________________
ADDITIONAL ACCESSORIES
_____________________________________________________________________________________________________
II. PRE-START-UP
CONTROLS
Are control(s) and indoor fan control wiring connections made and checked?
Are all wiring terminals tight? (including power to fan motors, heaters, etc.)
AIR HANDLER
Remove packaging and any construction debris.
Inspect for shipping and/or handling damage, make claims as required.
Inspect all panel flanges for damage. Panel flanges should be smooth with no sharp bends.
Are all corner connectors and frame to channel joints smooth with no cracks, large bumps
or depressions in the caulk?
Are any door latches loose or damaged? If so, tighten or replace
At each section joint, verify:
Is roof slider installed on top of
roof?
Is end roof bracket mounted and
gasketed to each side of roof
joint?
Are base rails bolted on both
sides?
Are upper side top brackets under
roof bolted and tightened?
Are both section to section joints
uniformly gasketed?
Is gasket compressed and a
section-to-section split caulked
along entire length of seam?
If CCH attached, verify CCH to
unit seals:
Is roof bracket slider installed on
top of roof?
Are side flashings installed on
both sides?
Is CCH to unit base joint caulked
per instructions?
Release fan holddown bolts and shipping brackets.
Check fan bearings and shaft(s) for tightness
Fan bearings are lubricated from the factory. Remove zerk fitting to verify. Do not overgrease!
Turn fan by hand to ensure no rubbing with housing.
Have fan and motor pulleys been checked for proper alignment?
Do the fan belts have proper tension?
Are proper air filters in place?
Are all wiring terminals to fan motors and heaters tight?
Has water been placed in drain pan to confirm proper drainage?
Is duct connected directly to the unit?
Verify wiring is correct for application (voltage, etc.) per component label.
Are field wiring penetrations into 39M properly sealed for air and water leaks (includes conduit inside box)?
START-UP CHECKLIST — 39MW OUTDOOR AHU UNITS
Joint 1
(pg 50)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(pg 50)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(pg 47-48) (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(pg 50)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
(pg 47)
(Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____ (Y/N) _____
CCH 1
(pg 72)
(Y/N) _____ (Y/N) _____ (Y/N) _____
(pg 71)
(Y/N) _____ (Y/N) _____ (Y/N) _____
(pg 72)
(Y/N) _____ (Y/N) _____ (Y/N) _____
______________________________________________________
Joint 2
Joint 3
CCH 2
CCH 3
CL-3
(Y/N) _____
(Pg 93)
(Y/N) _____
(Y/N) _____
(Pg 45)
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Y/N) _____
Joint 4
Joint 5
(Pg 46, Fig. 7)
(Y/N) _____
(Pg 121)
(Y/N) _____
(Y/N) _____
(Y/N) _____
(Pg 67)
(Y/N) _____
(Pg 68)
(Y/N) _____
(Pg 135-154)
(Y/N) _____
(Pg 67)
(Y/N) _____
(Y/N) _____
(Pg 50)
(Y/N) _____
(Y/N) _____
(Y/N) _____
Joint 6