Initial Operation Certification - REMKO RKS 510 Operation,Technology,Spare Parts

Combi air conditioning units
Table of Contents

Advertisement

Certification for
?
Initial operation
Unit data
Type of unit
Unit number
Refrigerant length/height of line
Oil elevation arcs
Additional quantities
Condensation pump
Operator / Assembly location
Street:
Telephone:
Test of cold cycle
Visual check:
Assembly of outdoor part and indoor unit
Heat-exchanger, insulation, lines
Electrical fuse protection type
Electrical power / control line
Impermeability check Vacuum
Excess pressure
Add. preparation:
Refrigerant refill amount
Shut-off valves open
Functional check:
Condensation flow, condensation pump(s)
Cooling mode
Operational check:
Compressor mode
Ventilator mode
Measurement tests:
Room temperature / Air outlet temperature°C / °C
Suction temperature / Overheating
Comments:
? The room air conditioning system above was put into operation without any objections.
? The operator has been trained and the operating instructions distributed.
? The unit could not be put into operation for the reasons indicated above.
Executing company:
Company:
Street:
Postal code, city:
Date
? Subsequent operation of a REMKO air-conditioning system
Outdoor part
RKS
———–
———–
———–
———–
Operator signature
Indoor unit
RKV
m/
m
units
g
Name:
Postal code, city:
Fax:
A
Cu (mm² / mm²)
mbar
mbar
g
°C / K
Stamp and signature
Signature of person assembling and
Date 01/2003
Result
R
good
R
good
R
good
R
/
good
R
good
R
good
R
good
R
good
R
good
R
good
R
good
R
good
R
/
good
R
/
good
putting unit into operation
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
Q
poor
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rks 513Rks 524Rks 524 hRks 513 h

Table of Contents