Mount Installation - vogel's PFW 6854 Installation Manual

Display wall mount, rotating
Table of Contents

Advertisement

Mount Installation

Step 1
Determine where the mount lo-
cation will be. Use a stud finder
to locate the nearest wall stud.
For ease of installation, it is recommended that two people perform the installation. One person should hold
the mount while the other person installs the lag bolt and washer. Making sure that the mount is level, the
person not holding the mount must mark and drill the second mounting hole and secure the second lag bolt
and washer.
Step 4
After the holes have been pre-drilled,
line up the mounting slot openings
with the pre-drilled holes.
Do NOT over-tighten lag bolts when attaching the mount to the wall. Improper installation may result in personal
injury or damage to property.
If the studs are 12" (304.8mm) apart, use three (3) 3" (76.2mm) lag bolts for the top rail and three (3) 3" (76.2mm)
lag bolts for the lower rail. If the studs are 16"(406.4mm), 18" (457.2mm) or 24" (609.6mm) apart, use two (2) 3" lag
Page 6
bolts for the top rail and two (2) 3" lag bolts for the lower
Step 2
Once the stud has been located, use a
pencil to mark the spot.
Step 5
Insert two (2) 5/16" x 3" lag bolts
and washers into the mounting
holes and tighten (see WARNING:
below
Using a 1/4" drill bit, drill the upper mount-
ing hole where the mark was made.
Place a level (supplied) on the top
rail and make sure that the mount is
level. Once the mount is level, Drill
pilot holes in the lower mount-
ing slots and install two (2) 5/16" x
3" lag bolts and washers into the
mounting holes and tighten.
Installation Instructions
rail.
PFW 6854
Step 3
Step 6

Advertisement

Table of Contents
loading

Table of Contents