Taylor 430 Torque Original Operating Instructions page 16

Shake/slush freezer
Hide thumbs Also See for 430 Torque:
Table of Contents

Advertisement

Holding the beater securely, slide the beater into the
freezing cylinder and align the hole at the rear of the
beater with the flats on the end of the drive shaft.
Slide the beater the remainder of the way into the
freezing cylinder and over the end of the drive shaft.
The beater assembly will not protrude beyond the front
of the freezing cylinder.
Figure 7
Step 3
Install the white plastic guide bearing on the short end
of the torque rotor. Slide the o--ring into the groove on
the long end of the torque rotor and lubricate the
o--ring. Do not lubricate the guide bearing.
Figure 8
Step 4
Insert the torque rotor end with the guide bearing into
the pilot hole in the center of the drive shaft. The hole
in the torque rotor shaft should be rotated to the 12
o'clock position.
Operating Procedures
Step 5
Assemble the freezer door with the "Ice Buster" (door
spout clearing device). To assemble the door with the
ice buster, install the o--rings on the draw valve and
lubricate.
Insert the draw valve into the door, leaving
approximately 1/2" of the valve sticking out the top of
the door.
12
Figure 9
Figure 10
Figure 11
Model 430 Torque

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents