Installation requirements
A pre-plumbing jig for installation on finished walls is
required for fitting the sub-mounting kit.
Connection pipes and clips are supplied with the pre-
plumbing jig.
Provide a gas shut-off valve on site with min. DN 15
and thermally actuated gas shut-off device.
Pre-plumbing jig installation instructions

Installation preparations

Drain outlet positioning

180
A
Fig. 1
4
Note
A DHW cylinder cannot be installed below the boiler
when a sub-mounting kit is used.
Ambient temperature max. 35 °C
Position drain outlet for condensate
shown in the diagram.