Installation Sequence Fitting The Sub-Mounting Kit - Viessmann Sub Mounting Kit Installation Instructions Manual

Heating circuit distributor for vitodens 200-w up to 35 kw
Table of Contents

Advertisement

Fitting the sub-mounting kit
6.
3.
4.
4x
Fig. 2
1. Align the drilling template below the fitting assem-
bly of the pre-plumbing jig.
2. Drill holes
10 mm and insert rawl plugs.
7
3. Fit the clips to the sub-mounting kit.
4. Secure the sub-mounting kit to the wall with the
screws and washers supplied.
5.
R1/2
1.
Ø 10
2.
4x
7.
5. Secure the mounting plate to the fitting assembly
using screws M 4 x 10 (self-tapping).
6. Secure the gas pipe with clip to the mounting plate.
7. Seal the on-site gas shut-off valve to the gas pipe.
5

Advertisement

Table of Contents
loading

Table of Contents