Webasto Thermo Top E Parking Installation Documentation page 18

Suzuki splash petrol from model year 2008 left-hand drive vehicle manual air conditioning
Table of Contents

Advertisement

1
1
4
1
1314128B_EN
2
38
2
1
39
3
40
1
41
2
Drill out perforated bracket 2 to 10 mm dia. at
position 3.
1 Silent block, flanged nut
3
1 Hose section [2x], 10 mm dia. clamp [2x]
2 Rubber-coated p-clamp, metering pump,
flanged nut
3 Perforated bracket
4 Silent block
Route fuel line and wiring harness of meter-
ing pump in corrugated tube 1along original
vehicle fuel line to fuel standpipe and secure
with cable ties.
1 Metering pump
2 Original vehicle bolt
Suzuki Splash
Preparing
perforated
bracket
Premount-
ing meter-
ing pump
Installing
lines
Installing
metering
pump
18

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermo top c parking

Table of Contents