Electrical System - Webasto Thermo Top E Parking Installation Documentation

Suzuki splash petrol from model year 2008 left-hand drive vehicle manual air conditioning
Table of Contents

Advertisement

Electrical system

Wiring harness pass through
1 Protective rubber plug
Earth point
1 Earth wire on wiring harness of heater
2 Original vehicle earth point
1314128B_EN
1
2
1
2
4
Digital timer
1 Digital timer
Wait until later to install the wiring har-
ness of the metering pump together
with the fuel line along the original ve-
hicle fuel lines in a 10 mm dia., 2,100
mm long corrugated tube on the under-
body
Fuse holder, K3 relay
1 Fuse holder
2 Original vehicle bolt, angle bracket
3 K3 relay, M5x16 bolt, washer, M5 nut
Suzuki Splash
1
3
1
2
3
5
Wiring har-
ness rout-
ing
diagram
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thermo top c parking

Table of Contents