5.4 Replacing an Analyzer

The Vertex M rack is designed for quick replacement of major components. You may replace both the
Chemcassette
and pyrolyzer analyzers while other analyzers continue to monitor.
®

5.4.1 Disconnecting Cables

In steps 4 and 5 of the sequence that follows, you will need to disconnect the circular tubing harness and four
electrical cables from the back of the analyzer. You need to reach around to the back of the analyzer as shown
in this photo. In disconnecting or reconnecting the harness and cables, note the following:
Section 5 - Maintenance
ChemCam USB Connection
(Optional)
Analyzer Communications
(reconnect this cable first)
Analyzer 24V
Power Supply
To disconnect, depress the
lock tab on the power connector
and pull to release
Multi-Function
Connector
NOTE:
Connection secures by slide latch.
Push up to open, down to close.
Circular Tubing Harness
To disconnect, rotate the red tab
on the tubing connector to the
open position and pull the connector off
To reconnect, align the ports on the
connector, seat the connector fully then
rotate the red tab to "lock".