Square Bracket Installation Instructions - Eaton COOPER POWER Cleer Series Installation Instructions Manual

600 a 15, 25, and 28 kv class cleer loadbreak connector system
Table of Contents

Advertisement

Step 6
Using supplied grounding clamps, connect bracket to
system ground. Grounding clamp accommodates wire
ranging from #8 sol to 2/0 str.
Attach drain wire of loadbreak connector (LCN) to system
ground.
Step 7
Remove protective shipping caps from 600 A deadbreak
bushing interfaces. Clean and lubricate.
Step 8
Install mating 600 A deadbreak terminations to each
deadbreak bushing per the instructions provided with those
kits.
4
CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS

Square bracket installation instructions

Step 1
Using 1/2" hardware (customer supplied) mount assembly
to mounting surface or mounting plates of enclosure. See
Figure 9.
N
ote:
The assembly should be secured with four (4) bolts
using one upper and lower slot on each side of the
bracket.
.530
(13 mm)
1.0
(25 mm)
Figure 9. Square bracket dimensions.
Step 2
Using supplied grounding clamps, connect bracket to
system ground. Grounding clamp accommodates wire
ranging from #8 sol to 2/0 str.
Attach drain wire of loadbreak connector (LCN) to system
ground.
Step 3
Remove protective shipping caps from 600 A loadbreak
bushing interfaces. Clean and lubricate.
Step 4
Install mating 600 A deadbreak terminations to each
deadbreak bushing per the instructions provided with those
kits.
MN650019EN March 2016
12.0
(305 mm)
(20 mm)
7.0
(178 mm)
.8
2.0
(51 mm)
7.0
(178 mm)

Advertisement

Table of Contents
loading