Summary of Contents for Eaton 200 A 35 kV class LE series
Page 1
COOPER POWER Loadbreak Apparatus Connectors SERIES Effective May 2015 MN650010EN Supersedes S500-41-1 March 2011 200 A 35 kV class “LE” series elbow installation instructions...
Page 2
CONTENTS OF THIS DOCUMENT SHALL NOT BECOME PART OF OR MODIFY ANY CONTRACT BETWEEN THE PARTIES. In no event will Eaton be responsible to the purchaser or user in contract, in tort (including negligence), strict liability or other- wise for any special, indirect, incidental or consequential damage or loss whatsoever, including but not limited to damage or...
FOR LIFE FOR LIFE Eaton meets or exceeds all applicable industry standards relating to product safety in its Cooper Power™ series products. We actively promote safe practices in the use and maintenance of our products through our service literature, instructional training programs, and the continuous efforts of all Eaton employees involved in product design, manufacture, marketing, and service.
21.1/36.6 kV 3Ø rated bushings (identified by purple nose pieces). TEST POINT Product information Introduction DRAIN Eaton’s Cooper Power™ series loadbreak elbow connector WIRE TAB is a fully-shielded and insulated plug-in termination for LOADBREAK connecting underground cable to transformers, switching BAND INSULATION cabinets and junctions equipped with loadbreak bushings.
Installation instructions Tools/Accessories needed: Tape Measure • Cable stripping and scoring tools, available from various tool Wire Brush manufacturers, are recommended for use when installing • loadbreak elbows. After preparing the cable, the elbow Knife • housing is pushed onto the cable. The load-break probe is Cable Stripping Tool threaded into the coppertop connector using the supplied •...
The probe (male contact) should be preassembled If an Eaton jacket seal is used, follow instructions supplied into the threads of the compression connector prior to with the jacket seal kit. crimping to ensure proper thread engagement.
Step 5 Step 6 Step 7 FOLLOWER COVER TEST POINT WITH CAP CLEAN AND LUBRICATE CLEAN ATTACH DRAIN LUBRICATE WIRE TO ELBOW CABLE DRAIN WIRE TAB ENTRANCE JACKET SEAL Elbow and loadbreak probe installation Step 7 By hand, thread loadbreak probe into threaded eye of coppertop connector.
Operating instructions Loadbreak operation Area must be clear of obstructions or contaminants that • would interfere with this operation. Loadmake operation Use clampstick to secure standoff insulator or portable • feedthru in bracket. Ground devices to system ground Area must be clear of obstructions or contaminations •...
Page 10
This page intentionally left blank. 200 A 35 KV CLASS “LE” SERIES ELBOW INSTALLATION INSTRUCTIONS MN650010EN May 2015...
Page 11
This page intentionally left blank. 200 A 35 KV CLASS “LE” SERIES ELBOW INSTALLATION INSTRUCTIONS MN650010EN May 2015...
Page 12
Eaton 1000 Eaton Boulevard Cleveland, OH 44122 United States Eaton.com Eaton’s Cooper Power Systems Eaton, Cooper Power, and Kearney are Division valuable trademarks of Eaton in the 2300 Badger Drive U.S. and other countries. You are not Waukesha, WI 53188...