Installation Instructions; Equipment Required; In-Line Bracket Installation Instructions - Eaton COOPER POWER Cleer Series Installation Instructions Manual

600 a 15, 25, and 28 kv class cleer loadbreak connector system
Table of Contents

Advertisement

Installation instructions

CAUTION
Eaton's 600 A loadbreak connector is designed to be
operated in accordance with normal safe operating
procedures. These instructions are not intended to
supersede or replace existing safety and operating
procedures. Terminators must be de-energized during
installation and maintenance. Visible break and
adequate grounding must be provided before cable
work proceeds. (Ensure that the connector is rated for
the intended application before it is installed.)
The loadbreak connector should be installed and serviced
only by personnel familiar with good safety practice and
the handling of high-voltage electrical equipment.

Equipment required

600 A Cleer loadbreak connector includes:
Molded rubber connector (LCN)
(2) 2-position 600 A loadbreak/deadbreak junctions with
stainless steel bracket
Mounting feet hardware kit
Silicone lubricant
Installation instruction sheet
Tools/Accessories needed:
1/2" wrench for mounting feet hardware (customer supplied)
1/2" mounting surface hardware (customer supplied)
3/4" wrench for mounting surface hardware (customer supplied)
In-line bracket instructions
Step 1
Using supplied 5/16" hardware, loosely attach pivot support/
mounting feet assembly to each side of mounting bracket.
See Figure 6.
N
ote:
Refer to mounting configurations and dimensions on
page 12, Figure 22.
Figure 6. Attach pivot support/mounting feet assembly
to bracket.
CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS
PIVOT SUPPORT/
MOUNTING FEET
ASSEMBLY
Step 2
Place assembly against the mounting surface.
Adjust the brackets for proper alignment and mark their
location on the mounting surface. See Figure 7 .
MOUNTING
SURFACE
ADJUST FOR PROPER ALIGNMENT AND MARK LOCATION
Figure 7. Adjust bracket and mark location.
Step 3
After mounting location has been marked, detach pivot
support/mounting feet assembly from bracket. Using 1/2"
hardware (customer supplied), mount pivot support/mount-
ing feet assembly on mounting surface according to location
marks made in Step 2.
Step 4
With pivot support/mounting feet assembly secure, using
supplied 5/16" hardware, mount bracket with junction to
pivot support/mounting feet.
Step 5
Adjust bracket to desired angle. Tighten all bolts securely.
See Figure 8.
Figure 8. Bracket angle adjustment.
MN650019EN March 2016
3

Advertisement

Table of Contents
loading

Table of Contents