Cable Isolation And Grounding Instructions; Equipment Required; Visible Break And Visible Ground Using T-Op Ii Or Bt-Tap Termination - Eaton COOPER POWER Cleer Series Installation Instructions Manual

600 a 15, 25, and 28 kv class cleer loadbreak connector system
Table of Contents

Advertisement

Cable isolation and grounding instructions

CAUTION
The 600 A Cleer grounded elbow is designed to be
operated in accordance with normal safe operating
procedures. These instructions are not intended to
supersede or replace existing safety and operating
procedures. The grounding elbow should be installed
and service only by personnel knowledgeable of good
safety practices and fully trained on the installation and
application of high voltage electrical equipment.
For product applications that require ratings or
characteristics not shown, contact your Eaton
representative for specific recommendations.

Equipment required

(2) 600 A Cleer grounding elbows
(2) 600 A Cleer standoff bushings
(2) 600 A Cleer insulated protective caps
Silicone lubricant
Installation instruction sheet
Visible break and visible ground using T-OP II or
BT-TAP terminations
WARNING
Visibly inspect grounding elbows, cables, ferrules, and
clamps prior to installation to ensure they are complete,
undamaged, and there is no corrosion or breakage.
Damaged or worn grounding equipment can result in
equipment failure that could cause property destruction
or personal injury.
WARNING
All associated apparatus must be de-energized during
installation or maintenance.
Step 1
Clean and lubricate apparatus
Clean and lubricate interfaces of protective caps and
standoff bushings using lubricant supplied or Eaton
equivalent.
Step 2
Install standoff bushing
Attach a #14 AWG copper drain wire from the standoff
bracket ground lug to system ground.
Securely fasten a clampstick to the eyebolt on standoff
bushing bracket and use the clampstick to position the
standoff in standoff pocket. Tighten eyebolt against
apparatus wall.
CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS
Step 3
Remove "C" connector
Refer to Loadbreak Operation shown in Operating
Instruction on pages 6 and 7.
Install "C" connector on Cleer standoff bushing.
BOL -T
TERMINATION
SOURCE
Figure 12. Remove "C" (LCN) connector.
Step 4
Install insulated protective cap
Attach Cleer loadbreak protective cap drain wire to system
ground.
Using a clampstick, install a Cleer 600 A loadbreak
protective cap on the source-side loadbreak bushing. See
Figure 13.
Cleer 600 A
LOADBREAK
PROTECTIVE CAP
SOURCE
Figure 13. Install 600 A loadbreak protective cap.
MN650019EN March 2016
REMOVE LCN
T-OP II OR BT-TAP
TERMINATION
LOAD
LOAD
7