Eaton COOPER POWER Cleer Series Installation Instructions Manual page 13

600 a 15, 25, and 28 kv class cleer loadbreak connector system
Table of Contents

Advertisement

Turn around and apply a force to the clampstick to push the
elbow onto the bushing. A popping or snapping sound is
often heard when this operation is performed.
To check that the elbow is properly latched apply a gentle
pull force to the clampstick. When latched properly the
elbow will not slide back off of the bushing.
As a last operation, push on the clampstick to seat the
elbow all the way onto the bushing again. This insures that
the elbow is latched and was not dislodged during the latch-
ing check in previous step above.
SOURCE
Figure 17. Install Cleer grounding elbow.
Step 9
Repeat process
WARNING
This procedure must be performed on both ends of the
cable for complete grounding.
Repeat steps 1 through 8 on opposite end of cable.
CLEER LOADBREAK CONNECTOR SYSTEM INSTALLATION INSTRUCTIONS
CLEER GROUNDING
ELBOW
LOAD
MN650019EN March 2016
9

Advertisement

Table of Contents
loading

Table of Contents