General information
1.5

REGULATIONS FOR INSTALLATION

ARES Tec is a gas category II
2H3P
The appliance must be installed in accordance with the instructions
contained in this manual.
Installation must be carried out by a
who is in charge of enforcing observance of all local and/or national
laws published in the Official Gazette, as well as all applicable
technical regulations.
It is necessary to observe the standards, regulations and requirements
for installation provided below, constituting a rough and non-exhaustive
list, in order to follow the evolution of the "state of the art". We
would like to underline that updating the list of standards is the
responsibility of the technicians authorised to carry out installation.
1.6

INSTALLATION

When the appliance is installed on existing systems, make sure that:
- The flue is suitable for condensation appliances, for the temperatures
of the combustion products, calculated and built in accordance with
regulations in force. That is it a straight as possible, water-tight and
insulated and does not have any obstructions or constrictions.
- The flue is equipped with an attachment to evacuate the condensation.
- The heating control unit is equipped with a pipe for the evacuation
of the condensation produced by the boiler.
- The electrical system is built in accordance with specific regulations
and by professionally authorised company.
- The flow rate, head and direction of flow of the circulation pumps is
appropriate.
- The fuel feed line and any existing tanks are set up in accordance with
regulations in force.
- The expansion vessels ensure complete absorption of the dilation of
the fluid contained in the system.
- Slurry and build-up have been cleaned out of the system.
If ARES Tec is being installed on existing Systems:
If it is possible to schedule the replacement, it is necessary to wash
the system preventively, with alkaline dispersants. Washing must be
carried out four weeks prior to replacement, with a system operating
between 35°C - 40°C.
heat unit.
professionally authorised
company,
Also observe the standards regarding the heating control unit,
construction regulations and requirements on combustion heating in
the country of installation.
The appliance must be installed, commissioned and subject to
maintenance in accordance with the current "state of the art". This also
applies to the hydraulic system, the flue exhaust system, the installation
room and the electrical system.
Failure to observe the above regulations will void
the warranty.
Attention!
If the new boiler has been replaced in an old system
without having preventively washed it as described
above, do not wash the system, as any residues of
the product in the circuit may fill the generator with
residues after replacement.
It is advisable to contact a company specialised in
water treatment.
Otherwise, if ARES Tec is being installed on a new system it is advisable
to wash it thoroughly in any case, using products that are suitable for
the entire system, and install a Y-strainer with two cut-off valves on the
return pipe to the boiler, so that it can be cleaned as needed.
This filter will protect the boiler from sediments coming from the
heating system.
In both cases it is necessary to keep the head losses localised in the
primary circuit, for the correct sizing of the pump.