Boiler Installation - Immergas HE COMBI INTERNAL Manual

Wall mounted heating only boiler
Table of Contents

Advertisement

1
BOILER
INSTALLATION
1.1 INSTALLATION
RECOMMENDATIONS.
designed for wall installation only; for heating
environments and production of domestic hot
water for domestic use and similar purposes.
cessories must have suitable characteristics (both
technical and structural), in order to allow (al-
- installation (according to the legislation and
technical standards in force);
- maintenance operations (including those
scheduled, periodical, ordinary and special);
- removal (to the outdoors in a place suitable
for loading and transporting appliances and
components) as well as any replacement with
equivalent appliances and/or components.
protrusions or recesses enabling access to the
By var ying the type of installation the
- Type C boiler if installed using concentric
pipes or other types of pipes envisioned for
the sealed chamber boiler for intake of air and
expulsion of fumes.
Only professionally enabled heating/plumbing
technicians are authorised to install Immergas
gas appliances.
Installation must be carried out according to
regulation standards, current legislation and in
compliance with local technical regulations and
the required technical procedures.
Installation of the HE 30 COMBI INT / EXT
boiler when powered by LPG must comply
with the rules regarding gases with a greater
density than air. Before installing the appliance,
ensure that it is delivered in perfect condition;
if in doubt, contact the supplier immediately.
Packing materials (staples, nails, plastic bags,
polystyrene foam, etc.) constitute a hazard and
must be kept out of the reach of children. Keep
(paper, rags, plastic, polystyrene, etc.). In the event
of malfunctions, faults or incorrect operation,
Hunt Heating technical
modify or repair the appliance alone.
Failure to comply with the above implies personal
responsibility and invalidates the warranty.
• Installation Standards:
All installation must comply with AS 5601.
Attention: wall mounting of the boiler must
generator.
ensure adequate support if inserted correctly
(according to technical standards) in walls made
of solid or semi-hollow brick or block. In the
case of walls made from hollow brick or block,
partitions with limited static properties, or in any
case walls other than those indicated, a static test
must be carried out to ensure adequate support.
-
N.B.: the hex head screws supplied in the blister
mounting bracket to the wall.
boiling temperature in atmospheric pressure.
system and hot water circuit suited to their
performance and capacity.
Flue terminal positions
f
Flue terminal positions. Shaded area indicates prohibited area
Ref.
Item
a
Below eaves, balconies and other projections (Appliances over 50MJ/h)
b
From the ground, above a balcony or other surface
c
From a return wall or external wall
d
From a gas meter
e
From an electricity meter or fusebox/breaker panel
f
From a drain pipe or soil pipe
g
h
j
Horizontally from any opening window, door, non-mechanical air inlet or other
k
From a mechanical air inlet including a spa blower
n
Vertically below an opening window, non-mechanical air inlet or any other opening
clearances shown on this page.
If you are unsure about clearances not indicated here,
in general refer to AS 5601 or your local autority.
4
they only
SI
YES
1-1
h
j
T
W
h
e
j
j
D
h
I
T
k
c
k
g
• All measurements are the minimum clearances
required.
• Terminals must be positioned so to aviod combustion
products entering the building.
NO
NO
D
Door
I
Mechanical air inlet
M
Gas meter
T
Flue Terminal
W Window
a
c
e
d
P
g
M
T
k
b
Min. Clearance
mm
300
300
300
1000
500
75
300
300
1000
500