Technical Data - RAIS VISIO 4 Series Installation Manual

Hide thumbs Also See for VISIO 4 Series:
Table of Contents

Advertisement

Technical data

Visio 70/43 F - Visio 70/43/39 3S - Visio 70/43/39 LC - Visio 70/43/39 RC
Gas type
(Natural gas - LNG)
Supply Pressure
Nominal Heat Input
Gross (Hs)
Nominal Heat Input
Net (Hi)
Consumption
Burner Pressure
(hot)
Injector Marking
Pilot
Efficiency Class
NOx Class
Type
Gas type
(Town gas)
Supply Pressure
Nominal Heat Input
Gross (Hs)
Nominal Heat Input
Net (Hi)
Consumption
Burner Pressure
(hot)
Injector Marking
Pilot
Efficiency Class
NOx Class
Type
60 - GB
INSTALLATION MANUAL
G20
I2H, I2E
mbar
20
kW
11.5
kW
10.4
m³/hr
1.075
mbar
18.5
180 Centre, 320 Left, 320 Right
G30-ZP2-312 (31.2 inj)
1
5
C11 / C31
G150.1
mbar
8
kW
9.4
kW
8.4
m³/hr
1.550
mbar
3.5
400 Centre, 700 Left, 700 Right
G150.1 CG (inj. 27.1 - 90)
1
5
C11 / C31
G20/G25
G25/G25.3
I2E+
I2L / I2EK
I2(43.46 -45.3 MJ/
m3 (0°C))
20/25
25
11.5 / 10.6
10.6
10.4 / 9.5
9.5
1.075 / 1.15
1.15
18.5 / 22
22.1
G20/G25
I2ELL
20
9.8
9.0
1.1
18.0

Advertisement

Table of Contents
loading

Table of Contents