Cabling the second optional DAE to extend back-end bus 0

a. Connect port 1 on SP A in the bottom slot in the DPE to port A on the link
control card A (LCC A) at the bottom of the DAE. [
b. Connect port 1 on SP B in the top slot in the DPE to port A on the link
control card (LCC B) at the top of the DAE. [
Connect the second optional expansion DAE to the DPE expansion port 0 to extend
back-end bus 0 (BE0) and designate this DAE as enclosure 1 of this bus. We refer to
the address of this enclosure as BE0 EA1 (0_1).
Use the following illustration to complete this cabling task:
Figure 27 Example: DPE to 15-drive DAE
B
A
2
4
5
NOTICE
When cabling the 15-drive DAE LCC SAS ports, ensure that the cables do not overlap
behind the DAE. The illustration above demonstrates the proper method for cabling to
the DAE LCC SAS ports.
Procedure
1. Label a pair of mini-SAS HD cables using the orange labels shown here.
B
A
B
A
x4
x4
x4
x4
1 GbE
Cabling the second optional DAE to extend back-end bus 0
Cable and power up your DAE components
1
]
2
]
A
B
A
B
#
5
4
0
1
x4
1
AC
DC
57

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Unity Series and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents

Save PDF