GE MULTILIN 269 MOTOR MANAGEMENT RELAY Series Instruction Manual page 75

Table of Contents

Advertisement

3 SETUP AND USE
1
PAGE 7: SETPOINT VALUES
PAGE 7: SETPOINT VALUES
METERING SETPOINTS
METERING SETPOINTS
This page is used to enable the 269 to display and/or trip and alarm on voltage or power values received
from a GE Multilin meter (MPM).
2
METERING SETPOINTS SET
METERING SETPOINTS SET
AND METER ON LINE? XXX
AND METER ON LINE? XXX
This setpoint is used to enable 269 communication with a GE Multilin meter.
NOTE: CT and VT ratio must be programmed before "YES" is entered for this setpoint.
YES - 269 initiates communication and enables all page 7 setpoints as programmed.
NO - 269 no longer communicates with the meter and all page 7 setpoints are disabled.
Factory Value = NO
3
METER MODULE
METER MODULE
NOT INSTALLED
NOT INSTALLED
This message is shown when the answer to the question in the above setpoint is "NO"; i.e. the meter is
not online.
4
METER PHASE CT
METER PHASE CT
PRIMARY = XXX AMPS
PRIMARY = XXX AMPS
Enter the phase CT primary value of the current transformers connected to the meter.
NOTE: Failure to enter a correct value for CT primary will result in incorrect values from the meter.
20-1500 (increments of 1)
Factory Value = 100
5
PHASE VT RATIO
PHASE VT RATIO
VT RATIO = XXX:1
VT RATIO = XXX:1
Enter the phase VT ratio of the voltage transformers connected to the meter.
VT ratio = VT primary / VT secondary (round to one decimal place).
NOTE: Failure to enter a correct value for VT ratio will result in incorrect values from the meter.
1-255 in steps of 1
Factory Value = 1
6
METER PHASE VT SECONDARY
METER PHASE VT SECONDARY
VT SECONDARY = XXX VOLT
VT SECONDARY = XXX VOLT
Enter the VT secondary of the voltage transformer connected between the system and the meter. All
under and overvoltage protection is expressed as a percent of this setpoint.
40–240 (increments of 1)
Factory Value = 120
3-36
Setpoints, Pg. 7

Advertisement

Table of Contents
loading

Table of Contents