Furuno CH-500 Installation Manual page 18

Dual-frequencysearchlight sonar
Hide thumbs Also See for CH-500:
Table of Contents

Advertisement

1. MOUNTING
5. Set the control unit to the control mounting base, then tightly fasten the two bolts
that were fastened loosely at step 2.
When you set the control unit, align the two notches on the control unit to the bolts
fastened at step 2.
6. Attach the two cosmetic plugs to the holes at the top of the control mounting base.
1.4.2
Flush Mounting
Prepare the optional flush mount kit (type: OP06-26, code no,: 001-458-050) for flush
mounting the display unit. The included items in OP06-26 are listed in the following
table.
Control Fixing Fixture
Self-tapping Screw
Hex. Head Slot Bolt
Procedure
1. Make a mounting hole in the mounting location, referring to the outline drawing at
the back of this manual.
1-8
Name
06-027-2543-0
5 20 SUS304
M4 12 SUS304
Align these notches to the hex.
head slot bolts.
Cosmetic plug (2 pcs)
Type
Code No.
100-409-520-10
000-162-609-10
000-162-939-10
Qty
1
4
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ch-600

Table of Contents