Power Procedures; Powering The Director On - EMC Connectrix ED-64M User Manual

2 gb fibre channel director
Table of Contents

Advertisement

Operating the Director
2

Power Procedures

Powering the
Director On
2-2
Connectrix ED-64M User Guide
Follow these steps to switch power on to the ED-64M and verify
operation. Refer to Figure 2-2 on page 2-4 for component locations:
1. One AC power cord is required for each power supply installed.
These are located on the bottom rear of the director. Ensure that
each cord is connected to a separate facility power circuit.
WARNING
An EMC-supplied power cord is provided for each director power
supply. To prevent electric shock when connecting the director to
primary facility power, use only the supplied power cord(s), and
ensure that the facility power receptacle is the correct type,
supplies the required voltage, and is properly grounded.
2. At the bottom rear of the director, set the power switch (circuit
breaker) to the up position.
The director powers on and performs power-on self-tests (POSTs)
to ensure correct operation of switch logic. These tests reside in
flash memory on the Control Processor (CTP) card.
During POSTs:
a. Amber LEDs on both CTP cards and all Fiber Port Module
(UPM) cards illuminate momentarily.
b. The green LED on each CTP card (active and backup)
illuminates as the card is tested and UPM cards are tested.
c. Green LEDs associated with Fibre Channel ports sequentially
illuminate as the ports are tested.
3. After successful POST completion, the green power LED on the
front bezel, green LED on the active CTP card, and green PWR
OK LEDs on both power supplies remain illuminated.
4. If a POST error or other malfunction occurs, contact EMC
Customer Support.
When powering on the director after removing and replacing a faulty
FRU, the amber system error LED may remain illuminated. Clear the
system error LED as part of the replacement procedure.

Advertisement

Table of Contents
loading

Table of Contents