Accessing The Inside Of The Brewer; Filling System; Heating System - Bunn ITCB Series Technical Training Manual

Hide thumbs Also See for ITCB Series:
Table of Contents

Advertisement

Accessing the Inside of the Brewer

The majority of service work to the ITCB brewer will require the removal of either the rear panel or the top panel. The
top panel is secured with 1 flathead screw. The rear panel is secured with either 6, 7 or 10 flathead screws, depend-
ing on the age of the machine.
Machine Function and Operations
Main Control Board
The main control is the brain of the brewer. In the Digital Brewer Control (DBC
single component that contains all of the programming software, it interprets all the data it receives from the level and
temperature sensors and activates components to fulfill those demands. The main control board responds to the
users input through the membrane switch and activates and controls the brew cycle. The control board can receive
data from Smart Funnels
In a digital tea brewer the control board takes the place of the liquid level control board, the timer board, the dilution
timer and the mechanical thermostat. All of these components are combined into a single unit.

Filling System

The fill system maintains the level of water in the brewer's tank. Any-
time water is drawn off of the tank during a brew cycle or from the hot
water outlet, the fill circuit activates to refill the tank.
The fill system consists of:
120VAC solenoid inlet valve
Flow control
Fill probe
Water enters the rear of the brewer from the supply line and first goes
through a plastic strainer mounted in the combination inlet solenoid/
dilution solenoid assembly. From the solenoid valve the water flows
through a .50 gallon per minute flow control washer and then into the
bottom of the water tank.
The 120VAC solenoid inlet valve is activated by the control board anytime the brewer calls for water. The valve opens
and allows water to flow, under line pressure, to the tank where the silicon tube connects to a fill tube attached to the
tank.
The control board monitors the level of water in the tank through a low voltage level probe mounted to the top of the
tank. The control board grounds a 2.5VAC signal to the tank through the water. If it looses this signal, the control
board will activate the inlet valve.

Heating System

The heating system consists of:
Water tank
Heating elements
High-limit thermostats
Temperature sensor
DV switch
The heating circuit maintains the water in the tank at a preset temperature this ensures that the water is always ready
for brewing.
14
ITCB Training Manual
through a sensing coil on the front of the machine.
®
) system, the control board is the
®
TO TANK
Drain clamp
inlet connection adapter
Dilution solenoid
Inlet solenoid
.50 GPM flow control
TO DILUTION NOZZLE
.50 GPM flow control
Checkvalve

Advertisement

Table of Contents
loading

Table of Contents