Navigator 500
Sodium analyzer
3.1.5 Connecting the reagent / calibration / regeneration tubing
The following tubing connections must be made on site, all other tubing connections are factory-made. All other internal wet-section
tubing connections are factory-made.
Referring to Fig. 3.5:
1. Connect the end of reagent tubing
2. Connect the calibration solution 2 tubing QD coupling plug
solution 2 bottle.
3. If an optional regeneration bottle is fitted, connect the regeneration solution tubing QD coupling plug
F
connector
at the base of base of the regeneration solution bottle.
4. Connect the calibration solution 1 tubing QD coupling plug
solution 1 bottle.
Fig. 3.5 Reagent, calibration and (optional) regeneration tubing connections
OI/ASO550–EN Rev. G
A
B
to the connector
Entrainment
T-piece
To constant-head unit
To flowcell
on the reagent bottle.
C
to the mating connector
G
to the mating connector
3 Installation
D
at the base of the calibration
E
to the mating
H
at the base of the calibration
Calibration + Regeneration
valve assembly
11