Adjust Tote Guides

• Seal burst may cause flying debris or product
resulting in eye injury. Do not force fully inflated
seal into the tote. Do not inflate the seal when
not installed on the ram plate. Wear safety
glasses when operating the system.
• The ram plate or the pump inlet can pinch
fingers resulting in serious injury. Keep hands
and fingers away from the rim of the tote when
raising or lowering the ram. Keep fingers away
from the pump inlet.
1. Raise the ram to the highest position.
2. Position an empty tote under the ram plate.
3. Using Jog, slowly lower the ram plate to a point
just above the opening in the top of tote and
position the empty tote within the leg assembly
for accurate ram plate alignment with the tote.
4. If necessary, loosen the nuts and adjust tote
guides to the desired position for the tote.
Tighten the nuts on the guides.

Loading the Tote

NOTICE
To prevent seal damage:
• Inflate the seal only after the ram plate has
been lowered into the tote opening. Attempting
to lower a ram plate with an inflated seal can
damage the seal.
• Inflating the seal should only occur when the
seal is properly installed on the ram plate with
corner stops in place. When inflating the seal,
do not exceed 15 psi.
1. At the pneumatic control panel:
a. Open the air shutoff valves for the air controls
(K) and pumps (L).
b. On the control panel, move the Ram Position
Selector (A) to the Ram Up position. If the
ram does not elevate, increase the ram up
air regulator (G) pressure on the component
panel.
3A5416C
c. Move the tote in front of the frame.
d. Remove the lid from the fluid tote to expose
the fluid bag. If present, open the outer
plastic bag and pull it up over the sides of the
tote, exposing the aseptic inner bag.
e. Make sure the bag is taut and secure it in
place. Install the provided bag clamps.
f.
Load the tote of material into the center of
the frame. Center the tote with the ram plate.
g. Initial Setup Only: The frame has guides
to locate the tote. Adjust the guides (see
Adjust Tote Guides, page
tote under the ram plate. Leave enough
space between guides and tote to allow for
removal of the tote.
h. Move the Ram Position Selector (A) to the
Ram Down position.
i.
Ensure that the ram plate is centered inside
the tote. Be careful not to pinch the inflatable
seal when it enters the tote.
2. At the electro-pneumatic control panel:
a. Open the air shutoff valves for the air controls
(CE) and pumps (CF).
b. Navigate to the Manual Run screen. Raise
the ram to its highest point and engage the
safety latch.
c. Move the tote in front of the frame.
d. Remove the lid from the fluid tote to expose
the fluid bag. If present, open the outer
plastic bag and pull it up over the sides of the
tote, exposing the aseptic inner bag.
e. Make sure the bag is taut and secure it in
place. Install the provided bag clamps.
Load the tote of material into the center of
f.
the frame. Center the tote with the ram plate.
g. Initial Setup Only: The frame has guides
to locate the tote. Adjust the guides (see
Adjust Tote Guides, page
tote under the ram plate. Leave enough
space between guides and tote to allow for
removal of the tote.
h. Release the safety latch and jog the ram to
lower to the tote.
i.
Ensure that the ram plate is centered inside
the tote. Be careful not to pinch the inflatable
seal when it enters the tote.
Operation
25) to center the
25) to center the
25

Advertisement

Table of Contents
loading

Table of Contents