Pentair IntelliBrite 5G Installation And User Manual page 19

White and color pool and spa lights
Hide thumbs Also See for IntelliBrite 5G:
Table of Contents

Advertisement

Available languages

Available languages

REMOVING THE LIGHT CIRCUIT BOARD ASSEMBLY
1.
Using a 1/4 in (0.64 cm) nut driver, carefully remove the four retainer nuts
from the light assembly (see illustration on next page). Place the nuts aside
for reinstallation.
2.
Unplug the two connector plugs from the circuit board. Lift up the circuit
board and remove it from the light housing base.
3.
Carefully lift off the old thermal strips from the base of the light housing base
and discard.
Circuit board
connector plugs
Thermal
strip (2x)
4.
Place the two new thermal strips (provided) over the circuit board studs in
the base of the light housing.
5.
Place the light circuit board over the base studs and seat the circuit board
on top of the thermal strips. Be sure the two connecting wires are not caught
between the housing and the edge of the circuit board.
6.
Using a 1/4 in (0.64 cm) nut driver, tighten each of the four retaining nuts to a
torque value of 6.0 (minimum) to 8.0 (maximum) in-lbs to secure the circuit board.
DO NOT OVERTIGHTEN THE CIRCUIT BOARD NUTS.
INSTALLING THE INTELLIBRITE
GASKET AND UNI-TENSION WIRE CLAMP (See step 1 on next page)
ensure proper electrical ground. Failure to install all of the retaining nuts
could create an electrical hazard which could result in death or serious
injury to pool users, installers or others due to electrical shock.
Continue on next page.
®
POOL LIGHT ASSEMBLY WITH NEW
Be sure to install ALL of the four retaining nuts. These nuts
INTELLIBRITE
Retaining nut (4x)
5G Pool and Spa Lights Installation and User's Guide
®
Circuit board
Light housing
Circuit board
stud (4x)
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents