Pentair IntelliBrite 5G Installation And User Manual page 14

White and color pool and spa lights
Hide thumbs Also See for IntelliBrite 5G:
Table of Contents

Advertisement

Available languages

Available languages

10
INSTALLING THE INTELLIBRITE
FIXTURE (AFTER ELECTRICAL REQUIREMENTS ARE MET)
2.
Cut the cable at the Junction Box, leaving at least 6 in (15.3 cm) of cord to
make connections.
3.
Strip back 6 in (15.3 cm) of the outer cord jacket to expose the three
insulated conductors (be careful not to damage the insulation on the
three inner conductors). Strip a 1/2 in (1.27 cm) of insulation off the three
conductors. Be careful not to damage the copper conductor.
4.
Connect all three conductors to the corresponding circuit wires in the
Junction Box and secure the Junction Box cover in place.
5.
Install the IntelliBrite
bronze (or stainless steel) pilot screw.
underwater light. This screw mounts and electrically grounds the housing
securely to the mounting ring and wet niche. Failure to use the screw
provided could create an electrical hazard which could result in death or
serious injury to pool users, installers or others due to electrical shock.
6.
Fill the pool until the underwater light is completely submerged in water
before operating the light.
7.
Final check for proper light operation: To check for proper operation,
switch on the main switch or circuit breaker, and the switch that operates the
IntelliBrite underwater light itself. The light should illuminate when power is
applied. If not recheck the installation steps starting with Step 1 on page 4.
®
Light assembly into the niche and tighten the special
Use only the special pilot screw provided with this
Pilot screw (bronze
or stainless steel)
®
5G POOL AND SPA LIGHT
Pilot screw (bronze
or stainless steel)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents