Notes on bringing the unit into the building
In order to reduce weight to 646 Lbs. burner and hopper may also be dismantled.
Note:
To install the heating system properly and ensure economical operation, operation, minimum clearance
dimensions indicated below must be observed and followed when setting up the boiler. In addition, make
sure that legislation in your country is complied with relating to the minimum clearance of the flue gas
tube.
Note:
Place the boiler according to the minimum clearances to the flue pipe connection point as defined in
NFPA 31, or if NFPA is not recognized, then the code pertinent to the installation location. Make sure that
you also comply with local regulations.
Note:
The boiler room floor must be flat und level and must be able to support boiler gross weight.
Generally the boiler should be placed on non-combustible floors. However, a shielding material can be
placed underneath the boiler and the chimney connector in the case of a combustible floor like shown on
the drawing below.
*
Min. clearance of flue gas connec-
tion from wall or part of building
a
Min. clearance rear of boiler from
wall or part of building
b
Min. clearance of side of boiler
from wall or part of building
c
Min. clearance of front of boiler
from wall or part of building
d
Min. clearance of side of burner
from wall or part of building
e
Minimum ceiling height
Note:
Above all, legislation in your country / city
must be observed!
*
Minimum clearances for shielding
material for floor protection
a
Rear of boiler
b
Left side
c
Front
d
Right side
Installation Manual PELLEMATIC® SmartXS
25
5 inches
18 inches
1 inch
25 inches
22 inches
73 inches
18 inches
1 inch
25 inches
22 inches

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents