Programmer diagram
Cut off position indication
Time key
t1
Pre-ventilation time with open air damper _
t2
Safety time
t3
Short pre-ignition time (ignition transformer on terminal 16)
t3'
Long pre-ignition time (ignition transformer on terminal 15) .
t3
Short post-ignition time (ignition transformer on terminal 15)
t4
Time of powering between terminals 18 and 19 (BV1 - BV2)
t5
Time of powering between terminals 19 and 20 (BV2 - power command)
t6
Post-ventilation time (with M2)
t7
Time between consensus upon start-up and the voltage to terminal 7 (start delay for fan motor M2)
t8
Start-up duration (without t11 and t12)
t10
Only for LAL2: time until the beginning of the air pressure check
t11
Dampers opening travel time
t12
Damper travel time in low flame position (MIN)
t13
Allowed post-combustion time
t16
Starting delay of consensus to air damper OPENING
t20
Time until the programmer automatic stop (without all burner commands)
* These data refer only to LAL2 type.