baltur BT 75 DSPG Manual User Instructions page 53

Two-stage progressive / modulating light oil burners
Hide thumbs Also See for BT 75 DSPG:
Table of Contents

Advertisement

Available languages

Available languages

Flame control
Equipment LAL1... with probe:
Probe minimum current at 230 V
Probe max. current without flame
Probe max. current
Measuring instrument positive pole
Probe cables length
-
- Laying with separate cable
- Three conductor cable
- Two conductor cable for probe line (bl, sw), single
conductor cable separate for the each phase
Equipment LAL2... with probe:
Probe minimum current at 230 V
Probe max. current without flame
Probe max. current
Measuring instrument positive pole
Probe cables length
- Laying with multiple cable
- Separate laying with cable
- Shielded cable (insulated shield)
- Shielding connection
* The cable has to be laid separately from other cables
19 / 32
98320_201302
QRB...
95 µA
- -
160 µA
To terminal 23
30 m max.
1000 m max.
- -
- -
QRB...
QRC1...
8 µA
3.9 µA
- -
0.8 µA
35 µA
- -
To terminal 22
not allowed
20 m
- -
RAR 7: 30 m
200 m
- -
RAR 8: 100 m
To terminal 23
- -
QRC1...
80 µA
12 µA
- -
--
- -
1 m max.
20 m max.
RAR
6.5 µA
- -
25 µA
- -

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents