Installation; Parts List - THORLABS PM200 Quick Reference

Optical power and energy meter
Hide thumbs Also See for PM200:
Table of Contents

Advertisement

PM200
2

Installation

2.1

Parts List

Inspect the shipping container for damage.
If the shipping container seems to be damaged, keep it until you have inspected
the contents and you have inspected the PM200 mechanically and electrically.
Verify that you have received the following items within the package:
1. PM200 power/energy meter console
2. Desktop power supply (5 VDC / 2.4 A)
3. Power cord according to local power supply
4. USB cable (USB Type A Connector to Mini USB Connector)
5. Cable 3.5 mm Audio Connector to Flying Leads for analog output
6. Adapter for the auxiliary connector in the top panel
7. USB memory stick (Flash Drive 1 GB) with instrument drivers, user
application and operation manual
8. Quick Reference
9. Certificate of Calibration
Optional Accessories
Environmental Measurement Module (Displays Temperature and Relative
Humidity)
Fiber Inspection Camera Module (Monochrome Fiber Inspection Camera
with Power Measurement Capability
4
© 2011 Thorlabs

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PM200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents