Download Print this page

Daikin FTKD24HV2S Service Manual page 19

5.0/6.0/7.1 kw class 15000/18000/24000/28000 btu/h class removal procedure

Advertisement

Si041144
Step
4. Remove the control PCB.
1
Unfasten the 3 hooks.
Lift up and remove the
control PCB.
Pull out the earth wire
2
from the terminal board.
Pull out the terminals
3
from the terminal board.
Removal Procedure
Procedure
Control PCB
Hook
Terminal
Points
Hook
(R9517)
Earth
wire
(R17243)
(R9519)
Removal of PCBs
17

Advertisement

loading