Figure 46
17 Spread the probe tip's wires so that the tips are slightly wider than the gap
N2750/1/2A User's Guide
NOTE
Allow the probe to warm up for at least 20 minutes.
f If available, use the N2787A 3D Probe Positioner to position the probe
straight up and down (perpendicular) to the PV Fixture as shown in
Figure
46.
Measurement setup for V
between the signal trace and the ground on PV fixture. See
page 68.
in
Performance Verification
Figure 47
on
6
67