Starting; Preparing The Instrument - Pentair HAFFMANS RPU-352 Instruction Manual

Redpost pu monitor
Table of Contents

Advertisement

2

5 STARTING

Temperature of
probe (channel 2)
Only for PRU-353:
Pressure
(channel 3)

5.1 PREPARING THE INSTRUMENT

Switch on the instrument. If there are any problems, such as insufficient charge in the battery,
the display will give the information you need. Before the temperature probes are connected
the location and numbering of the sockets is shown on the display.
Set up the bottle or can in the correct size holder and fit the correct length temperature probe.
Connect this probe into the channel 1 socket. Channel 1 is to the right of the display. When
calculating the results channel 1 is given most importance and is assumed to show the product
temperature.
Select the spray probe or second container temperature probe and connect it to channel 2.
Channel 2 is to the left of the display.
Both sockets must always be occupied. To run without one of the probes you can connect a
dummy temperature probe. (A special plug marked with a 'T'.) You can also configure a
channel to be permanently inactive: see the section "Key Plug". An inactive channel is shown
by an X on the screen.
RPU 352, RPU 353, RPC 80, RPC 50
HAFFMANS RPU 352, RPU 353, RPC 80 RPC 50
Temperature of
probe (channel 1)
Start
recording
Set pressure
zero
Page 19 of 112

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Haffmans rpu-353

Table of Contents