•
Unscrew the pump unit (Q8) from the frontal flange (Q9).
Q9
PIT STOP MAINTENANCE
Replacement of upper and lower gaskets 20 minutes.
•
Lock the pump unit into a vice and unscrew it with a 50mm
wrench;
•
Release the pump unit from the body of the suction valve;
Ed. 002 - 01/2017
Lower seal
•
Remove the piston stem (Q10) and remove the pump unit
sleeve (Q11);
Q8
Q10
•
Grip the stem valve (Q12) in a vice;
Q12
DRAGON LINER
Countersunk
side
Q11
www.larius.eu
27