N O T E !
• Peristaltic pump pre-filter PF2 ; The pre-filter must be replaced at regular intervals if the
condensate is loaded with particles. The "disposable filter" is inserted into the pump tube on the
suction side (see Figure 2) and can be easily replaced;
• Check the tubing of the SR25.1
(see operating instructions in the appendix);
• Check the diaphragm of the gas feed pump N3 KPE or N9 KPE
if necessary.
20
In order to protect downstream analyzers, the wet filter element
must always be replaced after a condensate ingress.
condensate pump every six months and replace it if necessary
PSS-5 | 1.00.03
every six months and replace
www.mc-techgroup.com