INSTALLATION INSTRUCTIONS

N O T E !
www.mc-techgroup.com
The case should be placed on an even horizontal surface to
ensure a secure and stable position.
The operating position is exclusively vertical. Only in this case is
the proper condensate separation and discharge in the heat
exchanger of the cooler guaranteed.
The gas conditioning case should be set up away from heat
sources and freely ventilated so that no unwanted heat
accumulation occurs.
For outdoor installation, adequate protection against direct
sunlight and moisture must be provided. In winter, the
installation site must be frost-free; observe the protection class
of the case.
To ensure the operational safety of the portable gas conditioning
unit and the downstream analyzers and to avoid false alarms,
the sample gas conditioning unit must not be used outside the
specified temperature range.
Downstream analyzers must always be operated at temperatures
well above the specified gas output dew point of +5 °C. The
temperature range of the downstream analyzers must not be
exceeded. This avoids any condensation of the gas in the
connecting lines to the analyzers.
Unheated gas sample lines must be installed with a gradient down
to the cooler. Condensate pre-separation is then not necessary.