Supply Connections; Tube Connections; Figure 3 Sample Gas Connection - M&C PSS Series Instruction Manual

Gas conditioning unit
Hide thumbs Also See for PSS Series:
Table of Contents

Advertisement

12

SUPPLY CONNECTIONS

12.1

TUBE CONNECTIONS

N O T E !
Figure 3 shows the possible medium connections. These are located recessed in a special mounting
frame on the right side of the sample gas conditioning case.
Condensate
Sample gas
Sample gas
Outlet
(Option: max. 4)
Figure 3
Sample gas connection
All tube connections are equipped with 4/6 mm sealing ring threaded hose couplings made of
polypropylene (PP) for gas input temperatures of up to a maximum of 80 °C [176 °F] (see chapter 8).
If heated sample lines are used, whereby the gas input temperatures are increased up to a maximum
of 180 °C [356 °F], additional bulkhead unions made of stainless steel are recommended.
Dimension 4/6 mm connecting tubes are used as standard.
14
Do not swap tube connections; connections are marked
accordingly.
After connecting all lines, the tightness must be checked.
Option:
Electrical connection
for heated sample line
max. 6A, (230V/50Hz or 115V/60Hz)
Outlet
Inlet
PSS-5 | 1.00.03
EIN
AUS
Meßgas
Kondensat
AUS
2
3
1
1
2
3
4
Option:
Mounting of max. 4 FM40
flowmeters possible
www.mc-techgroup.com
4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pss-5Pss-5/3

Table of Contents