Link The Workstation To The Ir; The Boot Up Process - M86 Security MSA Installation Manual

Ir
Hide thumbs Also See for MSA:
Table of Contents

Advertisement

A
: C
S
PPENDIX
ONSOLE
ETUP

Link the Workstation to the IR

The Boot Up Process

94
P
L
W
ROCEDURES
INK THE
ORKSTATION TO THE
The procedures outlined in this sub-section require the use of the CAT-5E cross-
over cable.
A. Plug one end of the CAT-5E crossover cable into the IR's LAN 2 port.
NOTE: When facing the rear of the chassis, the LAN 2 port is the port on the right.
Portion of MSA chassis rear
B. Plug the other end of the CAT-5E crossover cable into the setup workstation's
network card.
C. Connect the AC power cord to the back of the chassis and plug the cord into a
UPS power supply unit.
D. Power on the server by lowering the bezel and pressing the large button at the
right of the front panel:
Diagram of MSA chassis front panel, power button at far right
The boot-up process may take 5 - 10 minutes. When the drive light remains off for
30 seconds, the system is booted up. (See the LED Indicators and Buttons section
for a description of front panel LED indicators and buttons.)
If you wish to verify that the unit has been booted up, you can perform the following
test on your workstation:
1. On a Windows XP, Vista, and 7 machine, go to your taskbar and click Start > All
Programs > Accessories > Command Prompt.
2. Type in ping 1.2.3.4
3. Press Enter on your keyboard.
If you receive a reply, the unit is up.
IR
M86 S
I
G
ECURITY
NSTALLATION
UIDE

Advertisement

Table of Contents
loading

Table of Contents