Spare Parts; Spare Parts; Decommissioning; Short Period Of Machine Inactivity - Astoria Tempesta SAEP Use And Maintenance Manual, Instructions For The User

Table of Contents

Advertisement

9.7.5 Cleaning the shower screen and shower screen
containment ring
Clean the shower screen and
shower screen containment
ring on a weekly basis, follow-
ing the steps indicated below:
• Loosen the screw using a
screwdriver (1);
• Remove the shower screen
(2) and the shower screen
containment ring (3);
• Carefully wash the two com-
ponents with hot water;
• Reposition the shower screen and shower screen
containment ring in their original position and lock
everything in place with the screw.
9.7.6
Cleaning the shower screen group and filter holder
Clean daily the shower screen group
and of the filter holder with the brush
provided.
Thoroughly clean the inside of the
coupling ring and of the filter holder; as
well as the edge and the wings of the filter
holder, so as to eliminate any accumula-
ted coffee residues.
Use the special toothbrush supplied (see spare parts catalog).
9.7.7 Cleaning the steam nozzle
Clean the steam nozzle on a weekly basis as follows:
• Insert the steam wand into a jug with water and a
specific cleaner, in accordance with the manufac-
turer's instructions;
• Heat the solution with the steam nozzle;
• Let the nozzle cool down whilst
keeping it immersed in the solu-
tion for at least 5 minutes, so that
cleaner can rise inside the nozzle
due to the cooling effect;
• Repeat the operation 2 or 3 times
until no more milk residue is
dispensed.
38
44
of
10.

SPARE PARTS

Machine components and/or parts must only be
replaced by one of the Manufacturer's Qualified Techni-
cians.
3
2
Under no circumstances are Users authorised to replace machine
components and/or parts.
1
11.

DECOMMISSIONING

Short period of machine inactivity

11.1
"Short period of machine inactivity" refers to a period
of time exceeding one working week.
If the machine is switched back on after this period,
a Qualified Technician must replace all the water inside
the hydraulic circuits as indicated in para. "7.4 Water
renewal" on page 17.
Furthermore, all periodic maintenance operations
must be carried out, see para. "9.2 Periodic maintenance"
on page 33.

Long period of machine inactivity

11.2
"Long period of machine inactivity" refers to a period
of time exceeding 30 working days.
THE machine must be decommissioned by one of
the Manufacturer's Qualified Technicians because the
equipment must be disconnected from the electricity
and water mains, and all the internal circuits must be
emptied of water.
After being decommissioned, the machine can only
be recommissioned by a Manufacturer Qualified Techni-
cian.
Under no circumstances are Users authorised to decommission
and/or recommission the machine after long periods of inactivity.
12.

DISASSEMBLY

We recommend that the machine is disassembled by
one of the Manufacturer's Qualified Technicians.
USER Manual

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

Storm

Table of Contents